My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 07/11/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:44:49 PM
Creation date
9/8/2003 11:26:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br />! <br /> <br />S T A T E M E N T O F W 0 R K C E R T I F I E D <br /> <br /> STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION <br /> <br />MAIN BODy ITEMS (Group Level Detail) <br /> <br />Icucher No. 1 Sheet No: 15 <br /> <br /> Item Contract Unit Contract Contract To Date To Date Grp Line <br /> <br />lumber Item Unit Price Quantity Amount Quantity Amount No. No~ <br />7~21.511 50 MM, BITUMINOUS WALK M2 6.30 2,965.00 18,679.50 0.00 0.00 001 1170 <br /> <br /> Totals for Proposal Line Number 1170 2,965.00 $18,679.50 0.00 $0.00 <br /> <br /> 1.501 CONCRETE CURB & GLrfTER DESIGN B412 M 21.28 428.00 9,107.84 0.00 0.00 003 1180 <br /> Totals for Proposal Line Number 1180 428.00 $9,107.84 0.00 $0.00 <br /> <br /> 11.501 CONCRETE CURB & GUTTER DESIGN B418 M 24.79 168.00 4,164.72 0.00 0.00 003 1190 <br /> Totals for Proposal Line Number 1190 168.00 $4,164.72 0.00 $0.00 <br /> <br /> 1.501 CONCRETE CURB & GUTTER DESIGN B424 M 26.10 8,515.00 222,241.50 0.00 0.00 001 1200 <br /> Totals for Proposal Line Number 1200 8,515.00 $222,241.50 0.00 $0.00 <br /> <br /> 1.501 CONCRETE CURB & GUTTER DESIGN B618 M 22.85 1,096.00 25,043.60 0.00 0.00 001 1210 <br /> <br /> 1.501 CONCRETE CURB & GUTTER DESIGN B618 M 22.85 886.00 20,245.10 0.00 0.00 005 1210 <br /> <br /> Totals for Proposal Line Number 1210 1,982.00 $45,288.70 0.00 $0.00 <br /> <br /> 1.502 CONCRETE CURB DESIGN S5 M 35.70 84.00 2,998.80 0.00 0.00 001 1220 <br /> Totals for Proposal Line Number 1220 84.00 $2,998.80 0.00 $0.00 <br /> <br /> 1.507 200 MM CONCRETE DRIVEWAY PAVEMENT M2 42.84 228.30 9,780.37 0.00 0.00 001 1230 <br /> Totals for Proposal Line Number 1230 228.30 $9,780.37 0.00 $0.00 <br /> <br /> 10.602 MAIL BOX SUPPORT EACH 125.00 4.00 500.00 0.00 0.00 001 1240 <br /> Totals for Proposal Line Number 1240 4,00 $500.00 0.00 $0.00 <br /> <br />1 15.509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0,80 11,489.60 0.00 0.00 001 1250 <br />15o509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0,10 1,436.20 0.00 0.00 003 1250 <br />2545.509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0.10 1,436.20 0.00 0.00 005 1250 <br /> <br />2554.509 GUIDE POST TYPE B EACH 37.00 5.00 185.00 0.00 0.00 004 1260 <br />.4.509 GUIDE POST TYPE B EACH 37.00 4.00 148.00 0.00 0.00 006 1260 <br /> <br /> Totals for Proposal Line Number 1260 47.00 $1,739.00 0.00 $0.00 <br /> <br />7.603 WOODEN FENCE M 36.50 278.00 10,147.00 0.00 0.00 001 1270 <br /> <br /> Totals for Proposal Line Number 1270 278.00 $10,147.00 0.00 $0.00 <br /> <br />P17.603 B~BED ¥~IRE FENCE M 16.50 220.00 3,630,00 166.00 2,739.00 001 1280 <br /> <br /> Totals for Proposal Line Number 1280 220.00 $3,630.00 166.00 $2,739.00 <br /> <br />LOW S.P. N~JMBER 199-010-03 <br /> <br />FOR WORK COMPLETED AS CF 06/20/2000 <br /> <br />Contract Number: Z00516 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.