Laserfiche WebLink
STATEMENT OF WORK CERTIFIED <br /> <br /> STATE OF MINi~IESOTA - DEPARTMENT OF TP_A~MSPORTATiON <br /> <br />MAIN BODY ITEMS (Group Level Detail) <br /> <br />! <br /> <br /> I~W S.P. NUMBER <br /> <br /> Voucher No. 2 Sheet No: 13 <br /> <br /> ~em Contrac~ Uni~ Contract Contract To Date To Date Grp Line <br /> Number ~=em Unaa Price Quanci~y ~nount Quantiay Amount No, No. <br /> <br /> 2521.511 50 MM BITL~4INOUS WALK M2 6.30 2,965,00 18,679.50 0.00 0.00 001 1170 <br /> <br /> ToEal~ for Proposal Linc Number 1170 2,965.00 $t8,679.50 0.00 $0.00 <br /> <br /> 2531.501 CONCRETE Cb~ & G~/TTER DESIGN ~412 M 21.28 428.00 9,107.84 0.00 0.00 003 1180 <br /> Total~ for Proposal Line Number 1180 428.00 $9,107.84 0.00 $0.00 <br /> <br /> 2531.501 CONCRETE C~JR8 & GtrrTER 0ES[GN 8418 M 24.79 168.00 4,164.72 0.00 0.~O 003 1190 <br /> Total~ for Proposal Line Nun~er 1190 168.00 $4,164.72 0.00 $0.00 <br /> <br /> 2531.58~ CONCRETE CURB & G~/rTER DESIGN 8424 M 26.10 8,515.00 222,241.50 0.00 0.00 001 1200 <br /> Totals for Proposal Line Number 1200 8,515.00 $222,2~1.50 0.00 $0.00 <br /> <br /> 2531.50~ CONCRETE CUR8 & G~ER 0ESIGN B6LS M Z2.85 1,096.00 25,043.60 0.00 0.00 001 1210 <br /> 2531.501 CONCRETE C~3RB & GU~ER DESIGN 8618 M 22.85 886.00 20,245.10 0.00 0.~0 005 1210 <br /> Totals ~or Proposal LAne Number 1210 1,982.00 $~5,288.70 0.80 $0.00 <br /> <br /> 2531.502 CONCRETE CJRB DESIGN SS M 35.70 84.00 2,998.80 0.00 0.00 001 1220 <br /> Totals for Proposal Linc Number 1220 84.00 $2,998.80 0.00 $0.00 <br /> <br />1 2531.~07 200 MM CONCRETE DRIVEWAY PAVEMENT M2 42.84 228.30 9,780.37 0.00 0.00 001 1220 <br /> Toaals for Proposal LAne Number 1230 228.30 $9,780.37 0.00 $0.00 <br /> <br />i 540.602 MA~L 8OX SUPPORT EACH 125.00 4.00 500.00 0.00 0.00 001 1240 <br /> To~al~ for Proposal Line Nu~kber 1240 4.00 $500.00 0.00 $0.00 <br /> <br /> 2545.509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0.80 11,489.60 0.00 0.00 001 1250 <br /> CONDUIT SYSTEM (SIGNALS} LS ~4,~6~.00 0.i0 1,436.20 0.00 0.00 003 1250 <br /> CONDUIT SYSTEM (SIGNALS} LS 14,362.00 0.10 1,436.20 0.00 0.00 005 1250 <br /> <br /> Totals for Proposal L£ne Number 1250 1.00 $14,362.00 0.00 $0.00 <br /> <br /> 554.509 GUIDE POST TYPE 8 EACH 37.00 38.00 0.00 0.00 002 1260 <br /> 1,406.00 <br /> 2554.509 G~IDE PQST TYPE B EACH ~7.00 5.00 18E.00 ~,00 0.00 004 1260 <br /> 2554.509 GUIDE POST TYPE B EACH 37.08 4.00 148.00 0,00 0.00 006 1260 <br /> Totals for Proposal ~ine Number 1260 47.00 $1,739.00 0.00 $0.00 <br /> <br /> 2557.603 WOODEN FENCE M 36,50 278.00 10,147.00 0.00 0.00 001 1270 <br /> Totals for Proposal Line Number 1270 278.00 $10,147.00 0.00 $0.00 <br /> <br /> 2557.603 BARBED WIRE FENCE M 16.50 220.00 3~630.00 248.00 4,092.00 001 1280 <br /> To~als for Proposal Line Number ~280 220.00 $3,630.00 248.00 $4,092.00 <br /> <br /> FOR WORK COMPLETED AS OF 07/21/2000 Contract Number: Z00516 <br /> <br />129 <br /> <br /> <br />