Laserfiche WebLink
Table 3 <br />2011 Street Maintenance Program <br />Bituminous Overlay Quantities <br />Project Description Length Area Bitum. Tack Coat Milling Shoulder Patching <br />Mi Sq Yds Tons Gals Sq Yds CL Ft Tons <br />11-05 157th Lane 0.41 6,518 587 391 85 3.3 <br />11-06 Oak Run 0.43 8,329 750 500 80 3.4 <br />11-07 Magnesium St. 0.15 2,150 193 129 25 792 1.2 <br />11-08 Stanhope River Hills 0.49 11,291 1,016 677 85 3.9 <br />Totals 1.48 28,287 2,546 1,697 275 792 11.8 <br />Table 4 <br />2011 Street Maintenance Program <br />Bituminous Overlay Costs <br />Curb or Contracted City Total <br />Bitum. Tack Coat Milling Shoulder Striping Misc Const Constrct Patching Construction <br />Cost Cost Cost Cost Costs Cost Cost Cost Cost <br />11-05 157th Lane $ 32,262 $ 782 $ 850 $ - $ $ 678 $ 34,572 $ 656 $ 35,228 <br />11-06 Oak Run $ 41,227 $ 999 $ 800 $ $ $ 861 $ 43,887 $ 688 $ 44,575 <br />11-07 Magnesium St. $ 10,640 $ 258 $ 250 $ - $ $ 223 $ 11,371 $ 240 $ 11,611 <br />11-08 Stanhope River Hills $ 55,892 $ 1,355 $ 850 $ - $ $ 1,162 $ 59,258 $ 784 $ 60,042 <br />Totals $ 140,021 $ 3,394 $ 2,750 $ - $ $ 2,923 $ 149,088 $ 2,368 $ 151,456 <br />