My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/15/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 02/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:59:57 AM
Creation date
2/11/2011 9:13:55 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee <br />Date: 02/15/2011 <br />By: Tim Himmer <br />Engineering/Public Works <br />Information <br />Title: <br />Consider Roadway Modifications at TH 10 & Feldspar Street NW <br />Item #: 5. 5. <br />Background: <br />Staff receives several complaints each year regarding safety concerns at the TH 10 and Feldspar Street <br />intersection. This information is relayed to MnDOT so they can investigate the situation to review whether <br />modifications should be incorporated to mitigate the concerns. MnDOT recently completed their scoping <br />documents, which include a proposed safety improvement at this intersection in 2015. The proposed fix includes <br />the extension of turn lanes to 500' in each direction along TH 10, lighting, signing and striping improvements, <br />widening of the overall median width, culvert extensions, and the installation of a concrete median to better <br />channelize the turning movements (see attached). The estimated construction costs for this project are <br />approximately $300,000. <br />Notification: <br />Observations: <br />The proposed improvements do not appear to modify any access to/from local streets or businesses, as it is <br />currently a 3/4 intersection with no left turns allowed from the north and south (see attached photos). The project <br />will provide better assignment of access and decrease the median openings for each direction of traffic. Original <br />construction of the median to eliminate certain movements did not prohibit the desired restriction of movements. <br />Reconstructing the current geometry will better define the movements allowed and eliminate confusion of the <br />drivers. <br />Staff is looking for feedback from the Council on the proposed improvement, and whether there is any interest in <br />advancing this project sooner than what is currently outlined in MnDOT's funding schedule (2015). A few options <br />to consider include: <br />• Wait for MnDOT to perform the work as proposed <br />• Request/prepare another design option for MnDOT consideration <br />• Request that MnDOT advance the project sooner with the City front -ending the costs. A reimbursement <br />agreement would need to be executed with MnDOT under this scenario. <br />In conversations with MnDOT there may also be an opportunity to advance the project sooner if funds are freed up <br />from other scoped projects; whether they are eliminated all together, constructed using other funding sources, or <br />completed under budget in an amount sufficient to cover additional work. <br />Funding Source: <br />Staff is currently reviewing potential internal funding sources that could support this expenditure, and will <br />provide additional information at the meeting. <br />Staff Recommendation: <br />Committee Action: <br />Based upon discussion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.