My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/15/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 02/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:59:57 AM
Creation date
2/11/2011 9:13:55 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 8, 2011 <br />• Lift and permit cost included <br />Not to exceed cost $2,902.00 <br />Connexus Rebate: $830.00 <br />Net cost $2,072.00 (payback based 10 hrs day — 5 days / week $240.00 yr = 8.7 years) <br />Main Public works garage - Base: (similar to Building #1 Alternate #1) <br />• Replace 18 - 400-watt MH to 6-lamp fluorescent high bay ($80.00 rebate each) <br />• Retrofit 10 -- 8', 2L T12 with 4 — T8 lamps and new ballast: ($20.00 rebate each) <br />• 8 fixture mounted motion sensors for the 6 Lamp high bay fixtures ($40.00 rebate each) <br />• Replace 3 exit lights with LED style <br />• Replace 4 - 60-watt incandescent with CFL (did not include rebate for this work) <br />• 2 — new T8 fixtures for bath vanity <br />• 1- LEDkit <br />• Lift and permit cost included <br />Not to exceed cost $7,459.00 <br />Connexus Rebate: $2,001.00 <br />Notes: <br />• The new lighting in the shop will be good enough to eliminate the other strip fixtures so I would not <br />recommend retrofitting them. <br />• I would not recommend LED wall packs as the light quality is not good compared to HID. <br />• I would not place motion sensors on all shop fixtures as the on and off switching will lessen lamp life. My <br />design includes motions for the fixtures over the parked Vehicles (8). Main isle way fixtures to be on <br />during working hours <br />Net cost $5,458.00 (payback based 10 hrs day — 5 days ! week $1,131.00 yr = 4.82 years plus the savings created <br />by the ceiling motion sensors on the 8 fixtures) <br />Please call with questions <br />Thank you, <br />Brian Kovar, President <br />• Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.