Laserfiche WebLink
DESCRIPTION <br />(from 50 to 80 feet) <br />(from 80 to 100 feet) <br />(depth in excess of 100 feet) <br />CITY OF RAMSEY <br />2011 - 2012 FEE SCHEDULE <br />Laboratory Evaluation and Testing of Retained Soil Samples <br />Moisture content <br />Unit weight <br />Unconfined compressive strength <br />Atterberg limits <br />Mechanical analysis of soil ( #4 to #200 sieve openings) <br />Standard Geotechnical Report Note 2 <br />(less than 5 soil borings associated with report) <br />(5 to 10 soil borings associated with report) <br />(11 to 20 soil boring associated with report) <br />(21 or more soil borings associated with report) <br />Fees for Geotechnical services will be invoiced after submission of the report. Payment is <br />due within 30 days of receipt of the invoice. <br />Minneapolis • Fargo • Grand Forks <br />UNIT UNIT RATE <br />per foot <br />per foot <br />special quotation <br />per test <br />per test <br />per test <br />per test <br />per test <br />per report <br />per report <br />per report <br />special quotation <br />• Construction feasibility for public utilities and pavement section along proposed <br />road alignment. <br />• Logs of the soil boring with descriptions of nomenclature used for defining the <br />site soils. <br />• Estimated subgrade support strength parameters for design of the bituminous <br />roadway and recommendations for earthwork associated with installation of <br />water main and sanitary sewer. <br />• Anticipation of, and management of, ground water for design of structures and <br />pavements. <br />25.00 <br />28.00 <br />10.00 <br />16.00 <br />75.00 <br />75.00 <br />75.00 <br />600.00 <br />800.00 <br />1,000.00 <br />Note 1 If necessary, NTI will abandon the soil boring(s) using either a mixture of high solids <br />bentonite or neat cement as the infill materials is the advanced boring conforms to the <br />state's definition of "environmental borings ". We note that an additional surcharge of <br />$4.50 per foot in excess of our noted fees will be assessed against the project for <br />abandonment of all "environmental borings ". <br />Note 2 — Standard Geotechnical Report includes recommendations as itemized within the bullet <br />items defined below. Projects requiring additional recommendations will incur additional <br />cost in excess of the standard fees noted within this Fee Schedule. All such additional fees <br />will be determined on a project by project basis. <br />