My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 03/15/2011
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2011
>
Agenda - Council Work Session - 03/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:59:08 PM
Creation date
3/10/2011 4:11:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
03/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Security Requirements. <br />Final Agreement as March 4. 2011 <br />Attachment B <br />Co- Location Service Site requirements <br />Entity shall provide best practices physical security to the co- location service site <br />in the form of traditional lock service, key card, numeric access code, or electronic <br />security system equal to that which Entity provides for its own assets. Keys, key cards, <br />numeric access codes and the electronic security systems shall be maintained <br />according to industry standards. Entity shall take all reasonable precautions to ensure <br />the integrity of the security of the co- location service site. Anoka County shall make <br />reasonable efforts to ensure that its employees and agents, including ZAYO, follow all <br />written instructions at the co- location site as provided by the Entity. <br />B. Temperature and Environmental Control Requirements. <br />Space provided to ZAYO for the housing of the ZAYO system and equipment in <br />the co- location service site shall meet industry standards for temperature controls, <br />humidity, lighting, and protection from power surges and outages. Entity shall ensure <br />that the co- location service site temperature remains in a constant range between 68 °F <br />and 83 °F, and humidity remains in a constant range of 40 % - -60 %. Entity shall use best <br />efforts to implement a protection plan ensuring that the ZAYO System remains <br />functional in the event of a power outage or similar emergency. <br />C. Environmental Space Requirements. <br />Entity shall provide sufficient cubic space for the installation of the ZAYO system <br />and equipment in a secure area. ZAYO shall provide the space specifications for each <br />co- location service site directly to Entity. Entity shall ensure that the space provided to <br />ZAYO for the installation of the ZAYO System and equipment will also include sufficient <br />space for ZAYO to access the equipment for repairs, maintenance and upgrades. The <br />space will be convenient to the demarcation point, and will include any necessary space <br />to install cable, conduit, fiber, and or circuitry from the demarcation point to the <br />equipment. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.