My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 03/15/2011
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2011
>
Agenda - Council Work Session - 03/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:59:08 PM
Creation date
3/10/2011 4:11:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
03/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. DEFINITIONS <br />That the parties agree the following definitions for terms used in this Agreement: <br />a) Community Anchor Institutions: quasi - government, government, <br />educational and public safety institutions. <br />b) Co- location service sites: designated physical sites located in <br />various Community Anchor Institutions located in and around Anoka County. (See <br />Attachment A.) <br />c) ZAYO System: an integrated multi - cable, multi -ring fiber optic <br />communication system comprised of cables and ducts, lateral connections, and the <br />manholes and handholds locates therein, and related equipment required to provide <br />Connectivity Services as provided through the NTIA grant. <br />d) Connectivity Services: As described in Article V. <br />e) Underlying Rights: all deeds, IRUs, (exclusive or non - exclusive) <br />easements, rights -of -way agreements, licenses, grants, contracts and other rights, titles <br />and interests to use real property of any third person, which are reasonably necessary <br />for the construction, placement, location, installation, operation, use, IRU, rental, <br />maintenance, repair or replacement by ZAYO or Anoka County, as the case may be, of <br />the ZAYO System, Ducts, County Equipment, Cable or County Dark Fibers. <br />f) IRU: Indefeasible Right of Use. <br />g) Equipment: electronics, optronics, and other devices as necessary <br />to deliver the Connectivity Services. <br />h) Permitted use: Connectivity services shall only be used by <br />Community Anchor Institutions for quasi - governmental, governmental, educational or <br />public safety purposes and shall not be used to directly or indirectly compete with <br />ZAYO. <br />i) ZAYO Staff: Employees, consultants, and other sub - contractors <br />working under the direction of ZAYO to install and support the ZAYO System. <br />II. SCOPE OF SERVICES <br />A. Anoka County will provide, through its contract with ZAYO, Connectivity <br />Services to Entity through the fiber optic network built by ZAYO. Once the fiber optic <br />network is built and the system is installed in the various co- location service sites, <br />2 <br />Final Agreement as March 4. 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.