Laserfiche WebLink
Neither Anoka County nor Entity shall tamper with, remove or conceal any identifying <br />plates, tags, or labels identifying ZAYO's ownership interest in the ZAYO Equipment. <br />E. Equipment and service beyond the point of demarcation and /or <br />interconnection between ZAYO's facilities and Entity terminal Equipment and the wiring <br />at the point of demarcation shall be the responsibility of the Entity. <br />F. Entity shall provide access to ZAYO on behalf of Anoka County to provide <br />services for purposes of installation, maintenance and repair of ZAYO Equipment. <br />ZAYO, on behalf of Anoka County, shall restrict access to the co- location site space to <br />authorized ZAYO staff. ZAYO staff shall abide by any physical security requirements <br />provided to ZAYO in writing. ZAYO shall make reasonable attempts to provide at least <br />two days notice prior to entering the co- location site to install, maintain, or repair any of <br />the ZAYO Equipment. If it is not reasonably possible to provide such notice, or in an <br />emergency, ZAYO shall provide notice as soon as practicable, but in all events prior to <br />entering the co- location site. See Attachments B and D. <br />G. If Entity provides its own Equipment, Anoka County, or ZAYO on Anoka <br />County's behalf, shall have no obligation to install maintain or repair the Equipment. If, <br />on responding to an Entity initiated service call, Anoka County, ZAYO and Entity jointly <br />determine that the cause of the service delinquency was a failure, malfunction or the <br />inadequacy of Entity's Equipment, Entity shall compensate Anoka County /ZAYO for <br />ZAYO's actual time and materials expended during the service call. <br />H. Neither party shall adjust, align, attempt to repair, relocate or remove the <br />other party's Equipment, or ZAYO's Equipment, except as expressly authorized in <br />writing by the other party or ZAYO. <br />Prior to any installation of the SYSTEM, ZAYO will submit to Entity <br />entrance and construction plans specifying the location, construction and method of <br />installation related to the System. Entity shall respond to the plans with any objections <br />as soon as reasonably possible, but in any event no later than 60 days. Entity shall <br />immediately provide notice to ZAYO of known asbestos or other hazardous substances, <br />pollutants or contaminants as defined by the Comprehensive Environmental Response <br />Final Agreement as March 4. 2011 <br />5 <br />