Laserfiche WebLink
Page 1 of 1 <br />January 8,.2011 <br />• Lift and permit cost included <br />Not to exceed cost $2,902.00 <br />Connexus Rebate: $830.00 7 S2`� o r * 3� 6,2 <br />Net cost $2 �2.00 (payback based 10 hrs day — 5 days / week $240.00 yr = 8.7 years) <br />Main Public works garage - Base: (similar to Building #1 Alternate #11 <br />• Replace 18 - 400-watt MH to 6-lamp fluorescent high bay ($80.00 rebate each) <br />• Retrofit 10 — 8', 2L T12 with 4 T8 lamps and new ballast: ($20.00 rebate each) <br />• 8 fixture mounted motion sensors for the 6 Lamp high bay fixtures ($4 rebate each) <br />• Replace 3 exit lights with L.E.D style <br />• Replace 4 - 60-watt incandescent with CFL (did not include rebate for this work) <br />• 2 — new T8 fixtures for bath vanity <br />• 1 - LED kit <br />• Lift and permit cost included <br />Not to exceed cost $7,459.00 <br />Connexus Rebate: $2,001.00 « + 4'4c b l � Z. <br />Notes: <br />• The new lighting in the shop will he good enough to eliminate the other strip fixtures so I would not <br />recommend retrofitting them. <br />• I would not recommend LED wall packs as the light quality is not good compared to HID. <br />• I would not place motion sensors on all shop fixtures as the on and off switching will lessen lamp life. My <br />design includes motions for the fixtures over the parked Vehicles (8). Main isle way fixtures to be on <br />during .walking hours <br />{ % f l,s k cos.t <br />6 <br />Net cost $ 468.00 (payback based 10 hrs day — 5 days / week $1,131.00 yr = 4.82 years plus the savings created <br />by the ceiling motion sensors on the 8 fixtures) <br />Please call with questions <br />Thank you, <br />Brian Kovar, President <br />• Page 2 <br />To+w( c),5r <br />Corldl <br />http://156.142.212.178:8080/docs/2011/PW/20110315_99/434_scan0004.jpg 3/9/2011 <br />