August 15, 2000
<br />
<br />Honorable Mayor & City CounrJl
<br />
<br />City of Ramsey
<br />
<br />15153 Now~hen Blvd. NW
<br />Ramsey, MN 55303-6197
<br />
<br /> PAY ESTIMATE NO. 2
<br />Improvement Projects 99-66, 99-68 and 00-28
<br />
<br />RE: Improvement Projects 99-66, 99-68 and 00-28
<br />Contractor. Meadowvale Construction
<br />
<br />Contract Amount: ,1;262,461.00
<br />Award Date: June 14, 2000
<br />Completion Date: Final completion Bt Project No. 00.28 shall be July 22, 2000 and final completion of Projects 99-66 and 99-68 shall be September 1, 2.000.
<br />
<br />Schedule "A" - Improvement Proiect No. g9-66, Juniper Ridge Ddve
<br />
<br />Item Estimated I e
<br />No. spec. Ref. Description Quantity Contract Unit P.rice Contract Amount Us to Date Extension
<br />1 2104.505 Remove Bituminous Pavement 2747 SY $ 1.00 '$Y $ 2,747.00 2747 ,1; 2,747.00
<br />
<br />2 2104.513 Sawing Bituminous Pavement (Full Dept,h) 896 LF ,1; 3.00 LF ,1; 2.688.00 716 $ 2.148.00
<br />3 2104.602 IRelocateTree 2 EACH $ 300.00 EACH ,1; 800.00 0 $
<br />4 2105.521 Granular Borro.w,. LV 300 CY $ 6.00 CY ,1; 1,800.00
<br />5 2105.525 Topsoil Borrow, LV 75 CY ,1; 10.00 rc¥ $ 750.00 0 $
<br />6 2105.609 Geotextlle Fabric. Type ? 15 SY .I; 4.00 SY $ 60.00 14.3 $ 57.20
<br />7 2211.501 Aggregate Base Class 5 748 TON $ 8.00 'TON $ 5,984.00 718.8 $ 5,750.40
<br />8 2340.508 Type41 Wearing Course Mixture 416 TON $ 34.00 TON $ 14.144.00 0
<br />9 2340.514 Type 31 Base Course Mixture 281 TON $ 34.00 TON $ 9.554.00 0 $
<br />10 2357.502 Bituminous Material ForTack Coat 140 GAL $ 1.50 GAL $ 210.00 0
<br />11 2411,507 Concrete Weir I EACH ,1; 1,000.00 EACH $ 1,000.00 1 $ 1,000.00
<br />12 2411.507 Energy Dissipater 1 EACH $ 1,500.00 EACH $ 1,500.00 0
<br />13 2433.507 Remove & Reinstall Retaining Wall 40 LF $ 20.00 LF $ 800.00 3C $ 800.00
<br />14 2501.515 15" RC PipeApron I EACH $ 300.00 EACH $ 300.00 1 $ 300.00
<br />15 2503.511 8" PVC Pipe 8 LF $ 50.00 LF , $ 400.00 11.61 $ 580.00
<br />16 2503.511 15" Corrugated PE Pipe (CPP) 932 LF $ 20.00 LF I $ 18,640.00 935; $ 18,700.00
<br />17 2503.511 16" Steel Pipe Jacking 240 LF $ 150.00 LF $ 36,000.00 I 1201 $ 18,000.00
<br />18 2503.541 15" RC Pipe Sewer Desi~)n 3006. CL V 137 LF $ 25.00 LF $ 3,425.00 128.5 $ 3,212.50
<br />19 2506.501 Construct Draina~le Structure Design 48 - 4020 22.53 LF $ 170.00 LF $ 3,830.10 15; $ 2,550.0(]
<br />20 2506.501 Construct Drainage Structure Design 60 - 4020 5.17 LF $ 260.00 LF $ 1,344.20 5.17 $ 1,344.20
<br />21 2506.509 Construct Catch Basin - 2' x 3' 4 EACH $ 450.00 EACH $ 1,800.00,, 4; $ 1,800.00
<br />22 2506.509 Conslruct Catch Basin - 27" 1 EACH $ 300.00 EACH $ 300.00 11 $ 300.00
<br />23 2506.602 Casting Assemblies Type I I EACH $ 250.00 EACH $ 250.00
<br />24 2506.602 Casting Assemblies Type 2 5 EACH $ 280.00 EA,.CH $ 1,400.00
<br />25 2506.602 Casting Assemblies Type 3 4 EACH $ 200.00 EACH $ 800.00 41 $ 800.00
<br />26 2511.501 Random Riprap Class II 4 CY $ 40.00 CY $ 180.00 4! $ 160.00
<br />27 2535.501 Bituminous Curb 1761 LF $ 0.80 LF $ 1,408.80 01 $
<br />28 2557.602 Salvage & Reinstall Mailbox 5 EACH $ 20.00 EACH $ 100.00 0 $ -_
<br />29 2564.602 Salvage & Reinstall Sign 1 EACH $ 20.00 EACH $ 20.00 0; $ -
<br />30 2573.501 Bale Check 8 EACH $ 10.00 EACH $ 80.00 0 $
<br />31 2573.603 Silt Fence 15 LF $ 10.00 LF $ 150.00 151 $ 150.00
<br />32 2575.505 Sodding 1079 SY $ 3.00 SY $ 3.237.00. 0 ,1;
<br />33 2575,609 Tud Establishment 0.24 ACRE $ 1,500.00 ACRE $ 360.00 0
<br />
<br />Total Bid Schedule "A" ,1; 115.842.10 $ 61,849.30
<br />
<br />PAY 6.$tIM AT 62.
<br />
<br /> -137-
<br />Page 1 of 4
<br />
<br />
<br />
|