Laserfiche WebLink
I <br />I <br /> <br />S T A T <br /> STATE <br /> <br />IVoucher No. 3 <br /> <br />EMENT OF WORK C ERT I F I ED <br /> <br />OF MINNESOTA - DEPARTMENT OF TP~ANSPORTATION <br /> <br />MA. IN BODY ITEMS <br /> <br />2104.509 REMOVE SIGN ~AC~ <br />104.509 REMOVE SIGN EACH <br /> <br /> Totals for Proposal Line Number 0270 <br /> <br />{Group Level Detail) <br /> <br />Sheet No: 5 <br /> <br />Unit Con=tact Contract To Date To Date Grp Line <br />Price Quantity Amount Quantity Amount No. No. <br /> <br />14.00 75.00 1,050.00 64.00 896.00 001 0270 <br /> <br />14.05 15.00 210.00 11.00 154.00 003 0270 <br /> 90.00 $1,260.00 75.00 $1,050.00 <br /> <br /> i io4.sii SAWING CONCRETE PAVEMENT (~ULL DEPT~I <br /> <br /> 104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) M 16.50 2.00 33.00 0.00 0.00 003 0280 <br /> <br /> Totals for Proposal LAne Number 0280 7.00 $115.50 0.00 $0.00 <br /> <br /> 1 104.513 SAWING BIT PAVEMENT (FULL DEPTH) M 9.85 389.00 3,831.65 71.00 699.35 001 0290 <br /> 104 .513 SAWING BIT PAVEMENT (FULL DEP/~{) M 9.85 41.00 403.85 0.00 0.00 003 0290 <br /> 2104.513 SAWING BIT PAVEME~ {FULL DEPTH) M 9.85 77.00 758.45 0.00 0.00 005 0290 <br /> 104.513 SAWING BIT PAVEMENT (FULL DEPTH) M 9.85 405.00 3,989.25 0.00 0.00 007 0290 <br /> <br /> Totals ~or Proposal Line Number 0290 912.00 $8,983.20 71.00 $699.35 <br /> ....................................... ~/ ...... /. ...... _~ ..... .~. ..... <br /> <br /> i 104 .523 SALVAGE SIGN TYPE C EACH 14.00 5.00 70.00 0.00 0.00 001 0300 <br /> Totals for Proposal Line Nu,%ber 0300 5.00 $70.00 0.00 S0.00 <br /> <br /> 2104.523 SALVAGE SIGN TYPE D EACH 20.00 3.00 60.00 O.0O 0.00 001 0310 <br /> I Totals for Proposal Line Number 0310 3.80 $60.00 0.00 $0.00 <br /> <br /> 2104 .525 ;dSANDON & S~ WELL S~AFT ~AC~ 1,600.00 13.00 20,800.00 18.00 28,800.00 001 0320 <br /> <br /> I Totals for Proposal Line Number 0320 13.00 $20,800.00 18.00 $28,800.00 <br /> <br /> 2105.501 COb940N EXCAVATION (P) ~./ M3 3.92 39,517.00 154,906.64 27,4~1.00 107,725.52 001 0330 <br /> 2105.501 CO~MON EXCAVATION (P) M3 3.92 12,175.00 47,726.00 9,449.00 37,040.08 003 ~330 <br /> 1'.10~.501 COMMON EXCAVATION [P} M3 3.92 2,886.00 11,313.12 3,010.00 %1,799.20 005 0330 <br /> <br /> Totals for Proposal Line Number 0330 54,578.00 $213,945.76 39,940.00 $156,564.80 <br /> ....................................... w. ...... ~ ...... ~. ..... _/ ....... <br /> <br /> 105.505 MUCK EXCAVATION M3 4.25 6,940.00 29,495.00 7,870.00 33,447.50 001 0340 <br /> <br /> 105.505 MUCK EXCAVATION M3 4.25 796.00 3,383.00. 1,016.00 4,318.00 005 0340 <br /> To,als for Proposal LAne Number 0340 7,736.00 $32,878.00 8,886.00 $37,765.50 <br /> <br /> I [.~105.507 SUBGRJtDE EXCAVATION M3 3.92 31,420.00 123,166.40 14,738.00 57,772.96 001 0350 <br /> 2.105.507 SUBGRADE EXCAVATION M3 3.92 2,207.00 8,965.04 1,507.00 5,907.44 003 0350 <br /> 2105.507 SUBGRADE EXCAVATION M3 3.92 561.00 2,199.i2 561.00 2,199.12 005 0350 <br />I Totals for Proposal Line Number 0350 34,268.00 $134,330.56 16,806.00 $65,879.52 <br />· .................................................... _~ ..... M'_ ...... <br /> 2105.522 SELECT GP, A~ BORRO~ (LV) M3 5.77 2~,710.00 16£,656.70 9,493.00 54,774.61 001 0360 <br /> .105.522 SELEC'r GR3~ BORROW (LV) M3 5.77 3,359.00 19,381.43 1,711.00 9,872.47 003 0360 <br /> 105.522 SELECT GR3~ BORROW (LV) M3 5.7~ 2,563.00 14,788.51 0.o0 0.0o 005 0360 <br /> <br />W S.P. NUMBER 199-010-03 <br /> <br />FOR WORK COMPLETED ~ OF 08/24/2000 <br /> <br />Contract Number: Z00516 <br /> <br />-151- <br /> <br /> <br />