Laserfiche WebLink
S TATEMENT OF WORK C E RTI F I E <br /> STATE OF MIAr~ESOTA DEPARTMENT OF TRgtNSPORTATION <br /> <br />D <br /> <br /> MAIN BODY ITEMS (Group Level Detail) I <br /> <br /> Nu~er Item Uni[ Price Quantity A~nount Quantity Amount No. No. <br /> <br /> 2501.561 450 MM RC PIPE CLU~VERT DES 3006 M 80.89 27.70 2,240,65 0.00 0.00 002 058 <br /> To=als fo~ Proposal Line Nu~doer 0580 27.70 $~,240.65 0.00 $0.00 <br /> <br /> 2501.567 710 M~ SPA~ CS SAFETY APR & GR DES EACH 290.00 1.OD 9 . , . 9 <br /> <br /> Totals ~or Proposal Line Number 0590 1.00 $290.00 0.00 $0.00 <br /> <br /> 2501.569 375 MM RC SAFETY APRON EACH 310.00 15,00 4,65D.D0 6.00 1,860,00 002 060I <br /> 2501.$69 375 MM RC SAFETY APRON EACH 310.00 3.00 930.00 0.00 0.00 004 060 <br /> <br /> Totals ~or Proposal Line Number 0600 18.00 $5,580.00 6.00 $1,860,00 <br /> <br /> 2501.569 450 MM RC SAFETY APRON EACH 325.00 5.00 1,625.00 0.00 0.00 002 061~ <br /> 2501.569 450 h%~ RC SAFETY APRON EACE ~25.00 1.00 325.00 0.00 0,00 004 0610 <br /> Totals for Proposal Line Number 0610 6.00 $1,950.00 0.00 $0.00 <br /> <br /> 250i.569 600 MM RC SAFETY APRON EACH 315.00 3.00 945.00 2.00 630.00 002 <br /> Totals ~or Proposal Line Number 06~0 3.00 $945.00 2.00 $630.00 <br /> <br /> 2501.602 TP, A~H GUARD FOR 375 ~ PIPE APRON EACH ~63.05 11.00 1,893.55 4.00 1,05~.20 002 061~ <br /> Totals ~or Proposal Line Number 0630 11.00 S2,893.55 ~.00 $1,052.20 <br /> <br /> 2501 602 7~H GUAP~ FOR 450 MM PIPE APRON EACH 291 16 . <br /> <br /> 2501.601 TP~H GUkR/~ ~OR 450 MM PIPE APRON EACH 291.16 1.00 291.16 1.00 291.16 006 0640 <br /> To=als for Proposal Line Number 0640 2.00 ~ $582.~2 2.00 9582.32 <br /> <br />2501.'602 TRASH GUARD FOR 600 MM PIPE"APRON EACH 593.41 1,00 593.41 1.00 593.41 006 <br />To=als for Proposal Line Number 0650 1.00 $593.41 1.00 . $593.41 <br /> <br />2501.$02 TR3%SH GU~tRD FOR 675 MM PIPE APRON EACH 681.27 1.00 681.27 1.00 681.27 006 06 <br />To=als ~or Proposal Line Number 0660 1.00 $681.27 1.00 $6£1~27 <br /> <br />2501.602 TRJ~SN GUARD FOR 900 ;~4 PIPE APRON EACH 958.9~ 2.00 1.91S.64 1.00 955.9~ 00~ 06 <br />Totals for Proposal Line Number 0670 2.00 $1,917.84 1.00 $9S8.~ <br /> <br />2503.52! 725 MM SpAN RC PIPE-ARCH SEWER CL IIA M 171.71 44.20 7,589.58 46.40 7,967.34 002 06i <br /> Totals for Proposal Line Number 0680 44.20 $7,589.58 46.40 57,967.34 <br /> <br />2503.541 375 ~ ~C PIPE SEWER DES 3006 M 71.15 1,436.60 102,214.09 645.~0 45,~34.44 002 06 <br />2503.541 375 MM RC PIPE SEWER DES 3006 M 71.15 27.40 1,949.51 17,00 1,209,55 004 06 <br />2503.541 375 MM RC PIPE SEWER DES 3006 M 71.15 55.30 3,934.59 55.10 3,920.36' 006 0690 <br /> <br /> Totals for Proposal Line Number 0690 1,519.30 $108,098.19 717.70 $51,064.35 <br /> <br />LOW S.P. NUMBER 199-010-03 FOR WORK COMPLETED AS OF 08/24/2000 Con=fac% Number: Z00516 <br /> <br />-I <br /> I <br /> <br />-154- I <br /> <br /> <br />