|
STATEMENT O
<br />
<br /> STATE OF MII~ESOTA -
<br />
<br />F WORK C E RT I F I ED
<br /> DEPARTMENT OF TRANSPORTATION
<br />
<br />MAIN BODY ITEMS
<br />
<br />(Group Level Detail)
<br />
<br /> Voucher No. 3 Sheet No: 13
<br />
<br /> Item Con~rac~ Unit Conerac~ Con~rac~ To Date To Da~e Grp Line
<br /> Number Item Unit Price Quantity Amount ~anti~y Amount No. No.
<br />
<br /> 2521.511 50 ~4 EI~INOUS WALK M2 6.30 2,965.00 18,~79.50 0.00 0.00 001 1170
<br />
<br /> To~als for Proposal Line Number 1170 2,965.00 $18,679.50 0.00 $0.00
<br />
<br /> ~531.501 CONCP. ETE CJP~ & GUTTER DESIGN 8412 M 21.28 428.00 9,107.84 59.00 1,255.52 003 1180
<br />
<br /> T~=als for Proposal Line Number 1180 428.00 $9,107.84 59.00 $1,255.52
<br />
<br /> ........................................ ~. ~--o ~-'
<br />
<br /> 2531.501 CON3~ETE CURB & GUTTER DESIGN 841S M 24.79 168.00 4,164.72 160.~0' 3,966.40 003 1190
<br /> To~als for Proposal Line Number. 1190 166.00 $4,164.72 160.00 $3,966,40
<br />
<br /> 2531.501 CONC-KETE CUR~ & GUTTER DESIGN 8424 M 26.10 8,515.00 222,241.50 3,314.00 86,495.40 001 1200
<br /> Totals for Proposal Line Number 1200 8,515.00 $222,241.50 3,314.80 $86,495.40
<br />
<br /> 531.501 CONCRETE CJRB A GLr~TER DESIGN 8618 M 22 .85 1,096.00 25,043.~0 68.00 1,553.80 00i 1210
<br />531.501 CONCRETE CURB & GUT-FEE DESIGN B61B M 22.~5 886.00 20,245.10 0.00 0.00 00S 1210
<br />
<br /> Totals for Proposal Line Number 1210 1,982.00 $45,288.70 68.00 $1,553.80
<br /> ....................................... < ...... w. ....... ~_ ..... ~ .....
<br />1~531.502 CO~CRETE CURB DESIGN S5 M 35.70 84.00 2,998.80 0.00 0.00 001 1220
<br /> T~a!s for Proposal Line Number 1220 84.00 $2,998.80 0.00 $0.00
<br />
<br />1 ~531.507 200 ~4 CONCRETE DRIVEHAY PAVEM~N~r M2 42.84 228.30 9,780.37 0.00 0.00 001 1230
<br />To~als for Proposal Line Number 1230 228.30 $9,780.37 0.00 $0.00
<br />
<br /> 540.602 MA. IL BOX SUPPORT EACH 125.00 4.00 500.00 0.00 0.00 001 1240
<br /> Tosals for Proposal Line Number 1240 4.00 $500.00 0.00 $0.00
<br />
<br /> 2545.509 CONDUIT SYSTEM (SIGN~J~S) LS 14,362.00 0.80 11,489.60 0.4~ 5,744.80 001 1250
<br /> :$45.509 CONDUIT SYSTEM (SIGNAJ~S) LS 14,362.00 0.10 1,436.20 0.05 718.10 003 1250
<br /> 545,509 COndUIT SYSTEM .(SIGNALS} LS 14,362.00 0.10 1,436.20 0.05 718.10 005 1250
<br />
<br /> To~als for Proposal Line Number 1250 1.00 $14,362.00 0.50 $7,181.00
<br />
<br /> 554.509 GUIDE ~OST TYPE B EACh4 37.00 38.00 1,406.00 0.00 0.00 002 1260
<br /> 2554.509 GUIDE POST TYPE B EACH 37.00 S.0O 185.00 0.00 0.00 004 1260
<br /> 554.509 GUIDE POST TYPE B EACH 37.00 4.00 148.00 0.00 0.00 006 1260
<br /> Totals for Proposal Line Number 1260 47.00 $1,739..00 0.00 $0.00
<br />
<br /> 2557.603 WOODEI.I FENCE M 36.50 278.00 10,147.00 0.00 0.00 001 1270
<br />I Totals for Proposal Line Number 1270 278.00 $10,147.00 0.00 $0.00
<br />
<br /> 1557. 603 BARBED WIRE FENCE M 16.50 220.00 3,630.00 248.00 4,082.00 001 '1280
<br /> Totals for Proposal Line Number 1280 220.00 $3,630.00 248.00 $4,092.00
<br />
<br /> LOW S.P. NIR4~ER 199-010-03 POR WORK COMPLETED AS OF 08/24/2000 Con~rac~ Number: Z00516
<br />
<br />-159-
<br />
<br />
<br />
|