Laserfiche WebLink
STATEMENT OF WORK CERTIFIED <br /> STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION <br /> <br />MAiN BODY ITEMS <br /> <br />(Group Level Detail) <br /> <br />Voucher No. 5 ' Sheet No: 5 <br /> <br />Item Con~rac~ Unit Contract Contract To Date To Date Grp Line <br />Number Item Unit Price Quantity Amoun~ Quantity Amount No. No. <br /> <br />2104.509 REMOVE SIGN EACH 14.00 75.00 1,050.00 84.00 1,I76.00 001 0270 <br /> <br />2104.509 REMOVE SIGN EACH 14.00 15.00 210.00 15.00 210.00 003 0270 <br /> <br /> Totals for Proposal Line Number 0270 90.00 $1,260.00 99.00 $1,386.00 <br /> <br />2104.511 SAWING CONCRETE PAVE[dENT (FULL DEPTH) M 16.50 5.00 82.50 1.00 16.50 001 0280 <br />2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) M 16.50 2.00 33.00 0.00 0.00 003 0280 <br />Totals for Proposal Line Number 0280 7.00 $115.50 1.00 $16.50 <br /> <br />2104.513 SAWING BIT PAVEMENT (FULL DEPTH) M <br />2104.513 SAWING BIT PAVEMENT (FULL DEPTH) M <br />2104.513 SAWING BIT PAVEMENT (FULL DEPTH) M <br />2104.513 SAWING BIT PAVEMENT (FULL DEPTH) M <br />Totals for Proposal Line Number 0290 <br /> <br />9.85 389.00 3,831.65 290.00 2,856.50 001 0290 <br />9.85 41.00 403.85 13.00 128.05 003'0290 <br />9.85 77.00 758.45 0.00 0.00 005 0290 <br />9.85 405.00 3,989.25 100.00 985.00 007 0290 <br /> 912.00 $8,983.20 403.00 $3,969.55 <br /> <br />2104.523 SALVAGE SIGN TYPE C EAC~ 14.00 5.00 70.00 4.00 56.00 001 0300 <br /> Totals for Proposal Line Number 0300 5.00 $70.00 4.00 $56.00 <br /> <br />2104.523 SALVAGE S~GN TYPE D EAC~ 20.00 3.00 60.00 2.00 40.00 001 0310 <br /> Totals for Proposal Line Number 0310 3.00 $60.00 2.00 $40.00 <br /> <br />2104.525 ABA/gDON & SEAL WELL SHAFT EACH 1,600.00 13.00 20,800.00 19.00 30,400.00 001 0320 <br /> Totals for Proposal Line Number 0320 13.00 $20,800.00 19.00 $30,400.00 <br /> <br />2105.501 COMMON EXCAVATION (P) M3 3.92 39,517.00 184,906.64 41,267.00 161,766.64 001 0330 <br />2105.501 CO~ON EXCAVATION (P) M3 3.92 12,175.00 47,726.00 12,175.00 47,726.00 003 0330 <br />2105.501 COMMON EXCAVATION (P) M3 3.92 2,886.00 11,313.12 3,010.00 11,799.20 005 0330 <br />Totals for Proposal Line Number 0330 54,578.00 $213,945.76 56,452.00 $221,291.84 <br /> <br />2105.505 MUCK EXCAVATION M3 <br />2105.505 MUCK EXCAVATION M3 <br /> <br /> Totals for Proposal Line Number 0340 <br /> <br />4.25 6,940.00 29,495.00 7,870.00 33,447.50 001 0340 <br />4.25 796.00 3,383.00 1,01~.00 4,318.00 005 0340 <br /> 7,736.00 $32,878.00 8,886.00 $37,765.50 <br /> <br />4105.507 SUBGRADE EXCAVATION M3 3.92 31,420.00 123,166.40 32,467.00 127,270.64 001 0350 <br />~105.507 SUBGRA~E EXCAVATION M3 3.92 2,287.00 8,965.04 2,287.00 8,965.04 003 0350 <br />~105.507 SUBGRA~E ~XCA~ATION M3 3.92 561.00 2,199.12 561.00 2,199.12 005 0350 <br />Totals for Proposal Line Number 0350 34,268.00 $134,330.56 35,315.00 $138,434.80 <br /> <br />:i05.522 SELECT GR3~LAR SORROW (LV) M3 5.77 28,710.00 165,656.70 18,726.00 108,049.02 001 0360 <br />!105.522 SELECT GRFuNULAR BORROW (LV) M3 5.77 3,359.00 19,381.43 1,711.00 9,872.47 003 0360 <br />~105.522 SELECT GRANULAR BORROW (LV) M3 5.77 2,563.00 14,788.51 0.00 0.00 005 0360 <br /> <br />.OW S.P. NUMBER <br /> <br />FOR WORK COMPLETED AS OF 10/27/2000 <br /> <br />Contract Number: Z00516 <br /> <br />-214- <br /> <br /> ! <br />-! <br /> <br /> <br />