Laserfiche WebLink
CC Work Session <br />Date: 03/29/2011 <br />By: Brian Olson <br />Engineering/Public Works <br />Information <br />Title: <br />Consider demolition of property located at 14550 Armstrong Boulevard <br />Item #: 2. 5. <br />Background: <br />Similar to the previous case, Staff was given direction to demolish the building contingent upon an agreement with <br />the adjacent property owner that allow the use of the property for parking and would also require maintenance of the <br />property in lieu of rent. (see attached case) <br />Since that time there has been significant discussions regarding the property potentially being used as a go kart <br />track. At a future date, the City Attorney will be bringing back an agreement between Mr. Karl Jansen and the City <br />of Ramsey for some type of joint venture agreement for the operation of the go gart track. In the meantime, Staff is <br />recommending that the building be razed separately from the property use agreement. In a meeting held with the <br />Mr. Jansen, we agreed that the pavement would be left inplace and would be cut and removed further once the <br />interim use permit is approved for the proposed use. If there is a reason that this project (the go kart track) does not <br />move forward then the pavement would be removed in its entirety at a later time. <br />Observations: <br />It should be noted that there has been environmental concerns on this property and therefore there was a significant <br />amount of environmental testing on this property during the acquisition process in 2009. Attached to this case is the <br />Development response action Plan and Construction Contingency Plan that was approved by the Minnesota <br />Pollution Control Agency as well as the indemnification agreement that we required as a condition of the purchase <br />of the property. This indemnification agreement requires the prior property owner to pay for up to $150,000 of <br />contamination (if encountered) and expires 36 months after closing. The City Attorney believes that the closing <br />occurred in November 2009 but will verify this on Tuesday night. <br />Staff will have some information for a proposal to complete a pre demo asbestos survey (typical in all demolitions) <br />and an environmental contract that manages petroleum contaminated soils (if encountered). Staff will have an <br />estimate for these activities before the meeting on Tuesday. <br />Recommendation: <br />Provide consensus on moving forward with the demolition process without any conditions. <br />Funding Source: <br />The funding for this demolition would come from TIF 4. <br />Council Action: <br />Provide direction to move forward with the demolition without a property use and maintenance agreement. <br />