My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/01/2000
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2000
>
Agenda - Planning Commission - 02/01/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:21:38 AM
Creation date
9/8/2003 3:47:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/01/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(the "Site"); and <br /> <br /> WHEREAS, The Planning Commission met on February 1, 2000, conducted a public <br />hearing and recommended City Council approval of the request. <br /> <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br /> <br />1) The asphalt plant will be permitted to operate from April 1 through November 30 of each <br /> year. <br /> <br />2) <br /> <br />That the hours of operation shall be from 6:00 a.m. to 8:00 p.m. Monday through Saturday. <br />Any variance from these hours of operation shall require prior special approval by the City <br />Administrator or his/her designee. The City Council shall be notified of the temporary <br />change in hours. <br /> <br />That the operation of the asphalt plant and the emission of noise, odors, smoke, dust, fly ash <br />or other particulated matter from the site and operation shall be in compliance with and <br />regulated by the State of Minnesota Pollution Control standards. The Permit Holder shall <br />have in effect at all times during the term of this Permit, a Minnesota Pollution Control Air <br />Emission Permit for a hot mix asphalt plant. <br /> <br />4) <br /> <br />That any stock piles of material shall be limited to a maximum height of 35 feet as measured <br />from the existing ground elevation over which it is placed and shall be located no closer than <br />20 feet to any property boundary. <br /> <br />5) That crushing of demolition asphalt and concrete shall be conducted a minimum of one time <br /> per year. <br /> <br />6) That off-street employee parking shall be provided such that there is at least one parking <br /> space for each employee on the maximum working shift. <br /> <br />7) That no build-up of materiaI shall be permitted on any haul roads. There shall be no use of <br /> City streets which are not blacktopped. <br /> <br />8) <br /> <br />That the Permittee shall provide a map detailing haul routes on County and State Highways <br />which shall be approved by the City Administrator or his/her designee. Hauling may vary <br />from these routes only for a specific job and only with the prior approval of the City <br />Administrator or his/her designee. That the City Council shall be notified of the temporary <br />deviation from the specified haul routes. <br /> <br />9) That all costs incurred by the City in administering and enforcing this permit shall be the <br /> responsibility of the Permittee. <br /> <br />10) That all outside storage of equipment shall be in an orderly fashion. The outside storage of <br /> debris and/or materials not used in the operation and inoperable vehicles and equipment shall <br /> not be permitted. <br /> <br />11) Run-off shall be contained on the Site and shall be in accordance with the grading and <br /> drainage plans approved by the City at the time the original permit was issued in 1988. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.