My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/06/2000
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2000
>
Agenda - Planning Commission - 03/06/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:21:53 AM
Creation date
9/9/2003 8:26:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/06/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br /> <br />15153 NOWTHEN BOULEVARD N.W., RAMSEY, MINNESOTA 55303 <br /> <br />PHONE: (612) 427-1410 FAX (612) 427-5543 <br /> TDD (612) 427-8591 <br /> <br />March 3, 2000 <br /> <br />Mark A. Peck <br />H & P Development <br />13915 Radium St. NW Suite A <br />Rarnscy, MN 55303 <br /> <br />Re: Site Plan Review for West Radium Business Center <br /> <br /> oO <br />Dear Mr. Peck: <br /> <br />We are in receipt of a Site Plan (Sheet Al), Floor Plan Phase I (A2), Exterior <br />Elevations (A3), and Landscaping Plans (7_,1) prepared by Lampert Architects. <br />We are also in receipt of a Preliminary Grading, Drainage, and Erosion Control <br />Plan (Sheet 1), Preliminary Utility Plan (Sheet 2), prepared Cy Hakanson <br />Anderson Associates, Inc. All the plans are dated February 15, 2000. The Site <br />Plan (A-l) in regard to the lot size, hard surface coverage and green space <br />coverage was re-calculated and revised on March 3, 2000. We offer the following <br />comments: <br /> <br />General: The plan proposes to construct one 31,600 square foot office/warehouse <br />building on each lot, in two phases. The first phase construction would start <br />immediately with the second phase building commencing in appro~/,irnately 18 <br />months. The lots are generally located in the southwest comer of 14¢ Avenue N. <br />and Radium Street. The site plan is also subject to the approval of the Business <br />Park 95 Architectural Review Board and covenants. <br /> <br />Zoning: The site is located within an Industrial CO Zoning District. <br />Office/manufacturing/warehouse operations are permitted uses in this district. <br /> <br />Building Size: The phase one building is proposed to be 31,600 square feet. The <br />plan also indicates a second phase building proposed at 31,600 square feet. <br /> <br />Lot Coverage: Thc total site size is approximately 5.45 acres (237,204 square <br />feet). Lot coverage for phase one is restricted to 35% (42,554 square feet). The <br />building constitutes about 26% (31,600 square feet) lot coverage. Lot coverage <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.