My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2000
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2000
>
Agenda - Public Works Committee - 01/18/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:27:10 PM
Creation date
9/9/2003 9:05:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative #2 <br /> <br /> Estimated' <br />Item Description Unit Quantity Unit Cost Total Cost <br />Construction <br />15",RCP . . _LF 120 $20 $2,400 <br />18" RCP LF 180 $24 $4,320 <br />21" RCP LF 460 $28 $12,880 <br />27". RCP LF 160 $35 ...$.5,600 <br />30"'RCP .... LF 210 $40 $8,400 <br />33" RCP LF 350 $46 $16,100 <br />36" ROP LF 1,016 $52 $52,832 <br />48" RCP LF 16 $90 $1,440 <br />15"' Pipe Jacking LF 100 $160 $16,000 <br />21" Pipe Jacking! LF 60 $.1_80 $10,800 <br />15" RCP Apr_oD.w/Trash Guard Ea I $800 $800 ... <br />36" RCP Apron w/Trash Guard Ea 1 $1,800 $1,800 <br />48" RCP Apron w/Trash Guard Ea 1 $4,000 $_4_,000 <br />~8'~' Manhole ,: Ea I $2,000 $2,000 <br />60" Manhole Ea 3 $3,000 $9,000 <br />72" Manhole Ea 5 $4.,0.00 $20,000 <br />Control Structure Ea.... 1 $5~000 $5,000 <br />RR Permit Fee . LS 1 $2,500 $2,500 <br />Saw Cut LF 390 $3 $.1., ! 70 <br />-R~m(~ve BituminOus SY 780 .... $3 $2,340 <br />Pond Excavation CY 7,270 $5 $36,350.. <br />Stripping & Replacing Topsoil . CY 500 .$.3 $1,500 <br />Ciass5 Aggregate Ton 180 $12 $2,160 <br />Wearing Course Bituminous Ton 100 $40 $4,000 <br />Connect.to Existing Storm Sewer Ea I $500 ._ . $500 <br />Restoration LS I $3,500 $3,500 <br /> Subtotal $227,3.9.2 <br />...... Overhead (25%_) $56,848_ <br /> Estimated Construction Cost $284,240 <br />Easement <br />Pond Easement SF 34.,00.0 $2 $68,000 <br />Drainage & Utility Easement SF 46,900 $1 $46,900_ <br /> Estimated Easement Cost ,$114,900 <br /> <br />Estimated Total Cost - Alternative #2 $399,140 <br /> <br />3/ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.