Laserfiche WebLink
Item Description <br />Construction <br />15" RCP <br />18" RCP <br />24" RCP <br />30" RCP <br />33" RCP <br />36" RCP <br />42" RCP <br />48" RCP <br />54" RCP <br /> <br /> 8" Pipe Jacking <br />54" Pipe Jacking <br />54" RCP Apron w/Trash Guard <br />48" Manhole <br /> <br />60" Manhole <br />72" Manhole <br />84" Manhole <br />120" Manhole <br />Control Structure <br />RR Permit Fee <br />Saw Cut <br />Remove Bituminous <br /> <br />Class 5 Aggregate <br />~.ear!ng Course Bituminous <br />Connect to Existing Storm Sewer <br />Restoration <br /> <br />Easements <br /> <br />Dratnage& Utility Easement <br /> <br />Alternative #4 <br /> I Unit IEstimated <br /> Quantity I Unit <br /> <br />Cost <br /> <br />Total Cost <br /> <br />1,000 $20,000 <br />1 ;36,960 <br />340 $32 $10,8 <br />260 $40 <br /> <br />3OO ;13,800 <br />240 $12,480 <br />35O $75 <br />390 $90 ~35,100 <br />120 ;16,800 <br />60 ;10,200 <br />100 $500 <br /> <br />1 $5,400 $5,400 <br /> <br />5 ;10,000 <br />2 $6,000 <br />1 ;4,000 $4,000 <br />3 ;6,000 ¢.18,000 <br />1 ~9,000 $9,000 <br />1 $3,000 <br />1 $2,500 <br /> <br />390 . $1,170 <br />780 $3 $2,340 <br /> <br />180 $2,160 <br />100 $4O <br /> <br />I $500 <br />1 $2,000 $2,000 <br /> Subt~al <br /> <br /> Overhead <br />Estimated Construction Cost <br /> <br />I-SF I 50,200 I $1 $50,200 <br /> <br />Estimated Easement Cost <br /> <br />Estimated Total Cost -Altemative #4 $441,375 <br /> <br /> <br />