Laserfiche WebLink
Subdivision 1. Excavation Permit. An Excavation Permit is required to <br />allow the holder to excavate that part if the right-of-way described in such permit and/or to <br />hinder free and open passage over the specified portion of the right-of-way by placing equipment <br />described therein, to the extent and for the duration specified therein. <br /> <br /> Subd. 2. Obstruction Permit. An obstruction permit is required to allow <br />the holder to hinder free and open passage over the specified portion of right-of-way by placing <br />equipment, vehicles, or other obstructions described therein on the right-of-way for the duration <br />specified therein. <br /> <br />No Person may excavate or obstruct the right-of-way beyond the date or dates specified in the <br />permit unless such person: <br /> <br />ao <br /> <br />Makes a supplementary application for another right-of-way permit before <br />the expiration of the initial permit; and <br /> <br />b. A new permit or permit extension is granted. <br /> <br />Permits issued under this Section shall be conspicuously displayed at all times at the indicated <br />work site and shall be available for inspection by the City Inspector and authorized City <br />personnel. <br /> <br />4.10.10 Permit Applications <br /> <br /> Subdivision 1. Application for a permit is made to the City. Right-of-way <br />applications shall contain, and will be considered complete only upon compliance with, the <br />requirements of the following provisions: <br /> <br />a. Registration with the City pursuant to this Section. <br /> <br />bo <br /> <br />Submission of a completed permit applications form, including all required <br />attachments, and scaled drawings showing the location and area of the <br />proposed project and the location of all existing and proposed equipment. <br /> <br />c. Payment of all money due to the City for: <br /> <br />1. Permit fees and costs due; <br /> <br />2. Prior obstructions and excavations; <br /> <br />o <br /> <br />Any loss, damage, or expense suffered by the City as a result of <br />applicant's prior excavations or obstructions and the rights-of-way or <br />any emergency actions taken by the City; and <br /> <br /> <br />