Laserfiche WebLink
required by the City, the City at its option may perform or cause to be performed such work. In <br />that event the permittee shall pay to the City, within t~:iX2,' (30) days of billing, the cost of <br />restoring the right-of-way. If permittee fails to pay as required, the City may exercise its rights <br />under the performance and restoration bond. <br /> <br />4.10.14 <br /> <br />Joint Applications <br /> <br /> Subdivision 1. Registrants may jointly make applications for permits to <br />excavate or obstruct the right-of-way at the same place and time. <br /> <br /> Subd. 2. Registrants who join in and during a scheduled Obstruction or <br />Excavation performed by the City, whether or not it is a joint application by two or more <br />Registrants or a single application, are not required to pay the Obstruction and Degradation <br />portions of the Permit Fee. <br /> <br /> Subd. 3. Registrants who apply for permits for the same obstruction or <br />excavation, which is not performed by the City, may share in the payment of the obstruction or <br />excavation permit Fee. Registrants must agree among themselves as to the portion each will pay <br />and indicate the same on the application. <br /> <br />4.10.15 Supplementary Applications <br /> <br /> Subdivision 1. A right-of-way permit is valid only for the area of the right- <br />of-way specified in the permit. No permittee may perform any work outside the area specified in <br />the permit, except as provided herein. Any permittee which determines that an area greater than <br />that specified in the permit must be obstructed or excavated must, before working in that greater <br />area: <br /> <br />Make applications for a permit extension and pay any additional fees <br />necessitated thereby;and <br /> <br />b. Be granted a new permit or permit extension. <br /> <br /> Subd. 2. A right-of-way permit is valid only for the dates specified in the <br />permit. No permittee may begin its work before the permit start date or, except as provided <br />herein, continue working after the end date. If a permittee does not finish the work by the permit <br />end date, it must make application for a new permit for the additional time it needs and receive <br />the new permit or an extension of the old permit before working after the end date of the <br />previous permit. This supplementary application must be done before the permit end date. <br /> <br /> <br />