must have curbing); <br />(iii)Indicate front, rear and side yard setbacks. <br />2. Final landscape plan. The final landscape plan shall be drawn at a scale of one <br />inch equals 50 feet and shall contain the following information: <br />(i) Plant types (botanical and common names), number, location, and size; <br />(ii) Areas to be sodded; <br />(iii)Indicate existing vegetation; and <br />(iv) Indicate trees to be removed. <br />3. Final grading and drainage plan. The grading and drainage plan shall be drawn at <br />a scale of one inch equals 50 feet, 100 feet or 200 feet and shall contain the <br />following information: <br />(i) Existing and proposed grades with a minimum of two -foot contour intervals to <br />a known sea level datum; <br />(ii) Sufficient spot elevations on all proposed hard surface areas; <br />(iii) Estimated runoff of the area based on ten- and 100-year storm events; <br />(iv) Provisions to carry runoff to the nearest adequate outlet; <br />(v) Location of any proposed ponding areas, indicating the size and depth of the <br />pond and amount of acre feet of water to be stored; <br />(vi) Finish floor elevations of all buildings; <br />(vii) Identify soils by type and location, including identification of the water <br />table, and suitability of soil for the proposed development; and <br />(viii) Identify any areas located in a flood hazard zone as identified by the <br />department of natural resources. <br />4. Floor plans and elevations. All floor plans and elevations shall be drawn to a <br />legible scale and shall include the following information: <br />(i) Floor plans indicating square footage and dimensions of all proposed rooms; <br />and <br />and paint color. <br />(ii) Elevations of the proposed building, identifying exterior treatment, material, <br />5. Final plat. If a subdivision is required, the final plat shall be prepared in <br />accordance with this Code. With the final plans, the developer shall submit, for <br />approval by the city, a development schedule for construction of all structures, <br />