My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 04/12/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:00:28 PM
Creation date
4/11/2011 3:58:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZAYO, on behalf of Anoka County, shall restrict access to the co -location site space to <br />authorized ZAYO staff. ZAYO staff shall abide by any physical security requirements <br />provided to ZAYO in writing. ZAYO shall make reasonable attempts to provide at least <br />two days notice prior to entering the co -location site to install, maintain, or repair any of <br />the ZAYO Equipment. If it is not reasonably possible to provide such notice, or in an <br />emergency, ZAYO shall provide notice as soon as practicable, but in all events prior to <br />entering the co -location site. See Attachments B and D. <br />G. If Entity provides its own Equipment, Anoka County, or ZAYO on Anoka <br />County's behalf, shall have no obligation to install maintain or repair the Equipment. If, <br />on responding to an Entity initiated service call, Anoka County, ZAYO and Entity jointly <br />determine that the cause of the service delinquency was a failure, malfunction or the <br />inadequacy of Entity's Equipment, Entity shall compensate Anoka County/ZAYO for <br />ZAYO's actual time and materials expended during the service call. <br />H. Neither party shall adjust, align, attempt to repair, relocate or remove the <br />other party's Equipment, or ZAYO's Equipment, except as expressly authorized in <br />writing by the other party or ZAYO. <br />I. Prior to any installation of the SYSTEMZAYO System, ZAYO will submit to <br />Entity entrance and construction plans specifying the location, construction and method <br />of installation related to the System. Entity shall respond to the plans with any <br />objections as soon as reasonably possible, but in any event no later than 60 days. <br />Entity shall immediately provide notice to ZAYO of known asbestos or other hazardous <br />substances, pollutants or contaminants as defined by the Comprehensive <br />Environmental Response Compensation and Liability Act (CERCLA), Title 42, U.S. <br />Code, or similar state or federal law. <br />J. Entity shall provide to Anoka County 24-hour contact information for the <br />purpose of gaining co -location service site access. This information shall be used for <br />both business hour and non -business hour services access. Entity will review and <br />6 <br />Final Agreement as April '1 March 2g, 2011 Fina4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.