Laserfiche WebLink
CC Work Session <br />Date: 04/19/2011 <br />By: Mark Riverblood <br />Engineering/Public Works <br />Information <br />Title: <br />Review Recent Success of In-house Services and Review Contracted City Operations <br />Background: <br />Item #: 2. 2. <br />The purpose of this Topic Report is to summarize projects that illustrate the value of competent, professional <br />in-house staff, and also review functions the City has determined are best performed by the private sector - for <br />reasons of economy, efficiency or both. <br />Staffs position is that to maximize the return on investment (tax dollars); service to the public is best achieved by a <br />prudent combination of contracted services (like the Dept. of Corrections work force, turf fertilization etc.), full <br />time staff, and seasonal/temporary workers (such as interns). While these functions and outcomes are highly <br />interrelated, they shall be discussed (somewhat) separately, below. <br />Observations: <br />Recent successes of in-house services <br />As Council is aware, in 2010 the city called on the Letter of Credit (LOC) to complete the punch -list items and <br />remaining Stage 1 improvements for the 5 -year old SweetBay Ridge subdivision (former Gun Club property). The <br />preponderance of this work has been completed utilizing the $319,501 received. <br />The majority of the outstanding punch -list items were performed by contractors based upon quotes or bid, <br />consisting of bituminous overlay of the streets, miscellaneous municipal utility repairs (manholes and watermain <br />valve boxes), and significant concrete work (curb and sidewalk replacement). <br />However, the bids received (orginally submitted to the developer) for the boardwalk would have exceeded the <br />available funding. In January 2010, Council directed staff to complete all aspects of the project including the <br />boardwalk using a combination of FT staff (for more complex elements), the Department of Corrections work force <br />and seasonal workers; so as to complete all the Stage 1 improvements. <br />Initially it was forecast that some, but not all labor costs would be able to be 'captured' to complete larger punch list <br />items and 'rescue' the boardwalk aspect of the project that otherwise would not be able to be constructed. Staff is <br />pleased to report that not only was all work completed according to plan, but further, all labor costs were charged to <br />the LOC and $59,423 will be infused into the 2011 General Fund. <br />*For an in-house versus contracted labor comparison, the bid for the boardwalk construction labor by Custom <br />Manufacturing was $40+ per foot. The city's real costs, including ALL equipment, machine time and supervision <br />was $38.41 per hour. <br />It may also be useful to report that the example of the city's 'smart' application of resources above is not necessarily <br />unique. With the recent Sunfish Lake Park project, a little over $11,000 was saved (coupled with the project <br />coming in $35,000 under the approved budget) by using in-house forces. As the $11,000 amount of Park Trust <br />Fund dollars was not necessary to balance the final 2010 budget - the dollars remain in the Park Trust Fund to be <br />transferred to the General Fund this year if necessary. <br />