My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/1999
Ramsey
>
Public
>
Agendas
>
Council
>
1999
>
Agenda - Council - 04/27/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 3:40:54 PM
Creation date
9/11/2003 3:53:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/1999
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Life Fimess Site Review <br />April 1, 1999 <br />Page 4 of 4 <br /> <br />Drainage and Grading: This proposed grading plan has ,~vo aspects worthy of special note. <br />First, the building expansion will be set at the elevation of the existing building, which will <br />consequently require the importation of an estimated 56,000 cubic yards of fill material. This is <br />a significant number of L,'uck loads and it should be anticipated that protection and maintenance <br />of public roads used for the transportation of material within the City will be made a part of the <br />site plan conditions. Secondly, this plan proposes a 3:1 slope having a height of eighteen feet <br />above the wetland at the top of the slope. Special provision for erosion control will be required. <br />A permit will need to be obtained fi:om the Lower Rum River Water Management Organization <br />(LRRWMO) addressing this concern. <br /> <br />All 6rainage is collected fi:om the site through a storm sewer system and transmitted to a <br />sedimentation basin located in the southwestern comer of the site. Discharge fi:om this basin is <br />transmitted to the Wetland 675W. The LR.R.WMO will review t~ adequacy of the <br />sedimentation basin. A skimmer will be r6quired at the basin outlet. <br /> <br />Erosion Control: City staff recommends the use of erosion control bla~.kets along the steep <br />dope of the wetland, creating a temporary sedimentation pond over the area indicated as future <br />parkL~g during construction, and staff requests a soils engineering analysis of the slope near the <br />wetland for stability. The revised erosion control plan is subject to the approval of the City <br />Engineer. <br /> <br />Lighting Plan: The exterior lighting pla~ meets City Code requirements. <br /> <br />Signage: The signage prop}>sed in the plan is not approved through the site plan review process. <br />Sign permits are reviewed and issued by the Zoning Administrator following site plan approval. <br /> <br />The P~msey Pla~nlng Commission will be meeting to review the proposed site plan on Tuesday, <br />April 6, 1999, at 7:30 p.m. Staff suggests that you, or your representative, be present at this <br />meeting to answer any questions that may arise. <br /> <br />Enclosed for your information is a copy of the case cover sheet for the Planning Commission <br />meeting. If you have any questions, please do not hesitate to contact us at 427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik <br />Zoning Administrator <br /> <br />Steve Jankowski <br />City Engineer <br /> <br />S~rean J. Walther <br /> Community Development Assistant <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.