Laserfiche WebLink
H~kanson <br />Anderson <br />Assoc_, Inc, <br /> <br />CONTRACT CHANGE ORDER <br /> <br />Date: <br /> <br /> Order No. 2. <br />Page 1 of 2 <br />_APril 16, 199.9_ <br /> <br />IProject: <br /> Owner: City of Ramsey <br /> <br />ITo: Kuechle Underground <br /> (Coptractorl <br /> You are hereby requested to comply with the following changes from the contract plans and specifications: <br /> <br />Trunk Sanitary Sewer and Waterr,~ain Extension, Ramsay City_Improvement.Project 98-21 <br /> <br /> INCREASE <br />in Contract Price <br /> <br /> Description of Changes <br />(Supplemental Plans and Specifications Attached) <br /> <br />REVISICN TO INTERSECTION OF 143RD AVE. & JASPER (see detai[ i~,c'.uded) <br /> <br /> pescriPtior, <br />Remove Curb & Gutter <br />Remove Bit. F3vement <br />Type 31 Base Course Mixtur~ <br />Type 41 Wearing Course Mix'Lure <br />Bit. Mat. For T~ck Coat <br />Concrete Curb & Gutter B618 <br />Asphalt Millir.,~ 1 ~' Deep <br /> <br />75 LF ~ ~;2,65/LF = <br />285 SY ~ 80,99/SY = <br />32 TN ~ $26.00FFN = <br />41 TN ~ ~;28.00/TN = <br />30 GAL @ $1,00/GAL = <br />430 LF ~ ~;6.16/LF = <br />210 SY @ ~;6.73/SY <br /> <br /> $832..00 <br />$1,14C.00 <br /> <br />$2,6,. ~.80 <br />¢ 1,4! <br />$6,553.,.30 <br /> <br />i ~,ddition to prcj3ct: <br /> t.~m Spec. <br /> <br /> 2104.~05 <br /> 8. 2331.508 <br />9, 2331,508 <br /> O. 2357,502 <br /> 11. 2531.501 <br />_2232.501 <br /> OTAL PART ~: <br /> <br />REVISION TO STORM sEWER AT INTERSECTION OF RAMSEY BLVD. & 143"D <br /> <br />,emove from project: <br /> <br /> ~-9. 2621.5A 18' RCP CI3 (all depths) <br />i;2. 262.1.5A 18" RC Pipe Apron <br /> ;7. 2521.5C Standard Catch Basin (2' x 3') <br /> <br />I~ddition to project: <br /> <br />64 LF ~ $25.00/LF = <br />2 EA ~ $340,00/EA = <br />I EA @ $1,000.00/EA = <br /> <br />-$1,600.00 <br /> -$680.00 <br />-__~1,000.00 <br />-$3,280.OO <br /> <br />.8. 2621.5A <br />;1. 2621.5H <br />58, 2621.51 <br /> <br />15' RCP CI5 (all depths) <br />1 B" RC Pipe Apron <br />Riprap Cl III w/Geotextile Fabric <br /> <br />TOTAL PART B: <br /> <br />26 LF @ ~22,00/LF = <br />1 EA @ $300.OOIEA = <br />2'CY @ ~;44.00/CY = <br /> <br />$572,00 <br />$300.00 <br /> ~88.00 <br />$960.00 <br /> <br />-~2,320.00 <br /> <br />I\Share\MunlclpaI~ARAMSEY~628\RA628CO2,doc <br /> <br /> <br />