My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/1999
Ramsey
>
Public
>
Agendas
>
Council
>
1999
>
Agenda - Council - 04/27/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 3:40:54 PM
Creation date
9/11/2003 3:53:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/1999
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternate No. 2 - Install 10" Water Main <br />39 10" gate valve & box w/extension ~ems EA <br />40 ! 0" DIP, Cl. 52, 7' deep in place LF <br />4i ".'alve markers EA <br />Total Alternate No. 2 - I 0" Water Main <br /> <br />55 <br /> <br />Alternate No. 4 - Temporary Control Panels <br /> <br />Install temporary motor control panels <br /> <br />at Pump Facility No. 4. <br />Total Alternate No. 4 - Temp. Control Panels <br /> <br />LS <br /> <br /> Change Order No. 1 install steel carrier pipe~ <br /> <br />56 16" steel carder pipe LF <br />57 Blow sand inside pipe EA <br />58 Install field lock gaskets EA <br /> Total Change Order No. 1 <br /> <br />Change Order No. 2 <br />59 Install a 12" D.I.P at varying depths 7-10 fi FI' <br />60 Install a 12" G.V. and box EA <br />61 Install an 18" steel can-ier pipe, 0.25" wall <br />thick LF <br />62 Blow sand inside carrier pipe EA <br />63 Install field-lok or fast grip gaskets on each <br />watermain joint EA <br /> <br />64 Remove and reinstall the 12" M.J. plug <br /> <br /> removed from the cross reinstall on watermn. [iA <br />65 Install an 18" stl. carrier pipe for future 12" <br /> <br /> watermain FT <br />66 Install a 16" steel carrier pipe for a future 8" <br /> waterrnain FT <br />67 Insulation FTsq <br /> Total Change Order No. 2 <br /> <br />Change Order No. 3 <br /> <br />Inztall and remove temporary pump <br /> <br /> Total Change Order No. 3 <br /> <br />Total Base Bid <br /> <br />Total Alternate 2 - I 0" Water Main <br /> <br />Total Alternate 4 - Temp. Control Panels <br /> <br />I:~ 3~WO RD\REQUESTT.WB2 <br /> <br /> 2 <br />1,850 <br /> <br /> 2 <br /> <br /> I <br /> <br /> 160 <br /> <br /> 2 <br /> <br /> 100 <br /> 1 <br /> <br /> 80 <br /> <br /> 1 <br /> <br /> 5 <br /> 1 <br /> 80 <br /> <br /> 80 <br /> 800 <br /> <br /> 1,060.00 <br /> 23.60 <br /> 45.00 <br /> <br /> 3,600.00 <br /> <br /> 47.15 <br /> <br /> 747.50 <br /> 120.75 <br /> <br /> $33.35 <br />$1,440.00 <br /> <br /> $57.50 <br /> 5828.00 <br /> <br /> $132.00 <br /> S400.00 <br /> $42.50 <br /> <br /> $40.00 <br /> $1.45 <br /> <br /> 2 <br /> <br />1,873 <br /> <br /> 2 <br /> <br /> i <br /> <br /> 160 <br /> <br /> 2 <br /> <br /> 10 <br /> <br />92.50 <br /> <br /> I <br /> <br /> 80 <br /> <br /> 1 <br /> <br /> 5 <br /> <br /> 1 <br /> <br /> 8O0 <br /> <br />2.120.00 <br />44,202.80 <br />90.00 <br />$46,412.80 <br /> <br /> 3,600.00 <br /> $3,600.00 <br /> <br /> 7,544.00 <br /> 1,495.00 <br /> <br /> 1 ~207.50 <br />$10,246.50 <br /> <br /> 3,084.88 <br /> 1,440.00 <br /> <br /> 4,600.00 <br /> <br /> 828.00 <br /> <br /> 660.00 <br /> 400.00 <br /> <br /> 1,160.00 <br /> <br />$12,172.88 <br /> <br />S2,000.00 <br /> <br />$2,000.00 <br /> <br />$215,041.00 <br />$46,412.80 <br />53,600.00 <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />i <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.