Laserfiche WebLink
Work to Be Completed on Old Town Hall <br /> Improvement Estimates <br /> <br />Basement Area <br /> <br />Structural Supports <br />Change current supports under laminated beams to 6" x 6" posts, add 2 additional <br />posts and install new footings per drawing. <br /> <br />Insulation <br />Insulate with a minimum of R15 value around perimeter, including ends of floor <br />joists. Recommended insulation is polystyrene (foam). An acceptable fire barrier <br />shall be installed over the finished insulation. <br /> <br />Install minimum of 5 mm poly over existing ground surfaces. <br /> <br />Heating/Air Conditioning <br />Complete ductwork from furnace to areas on main floor. <br />Install fresh air duct to furnace. <br />Install Air Conditioning Unit <br />Hot Water Heater <br /> <br />Plumbing <br />Extend current plumbing to exterior water and sewer hookupsl <br /> <br />Electrical <br />Install lighting in basement. <br /> <br />Misc. <br />Install handrail on basement stairs. <br /> <br />Hook up building to natural gas <br /> <br />Main Floor <br />Plumbing <br />Install handicap fixtures in bathroom. <br /> <br />Texture ceiling and paint. <br /> <br />Carpentry <br />Install waterproof flooring (ceramic preferred) (bathroom) <br /> <br />Sand/finish existing flooring or install commercial grade carpet in main room and <br />entryway. <br /> <br />Install wainscoting in main room and entryway per drawing; <br />Install chair rail on top of wainscot. <br /> <br />May 3, 1999 <br /> <br />$200.00 <br /> <br />$500.00 <br /> <br />Minimal <br /> <br />$10,000.00 <br /> <br />$3,000.00 <br /> <br />$200.00 <br /> <br /> $300.00 <br />$1,000.00 <br /> <br />$5,226.00 <br /> <br />$800.00 <br />$500.00 <br /> <br />$1,000 <br /> <br /> <br />