My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 05/03/1999
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
1999
>
Agenda - Council Work Session - 05/03/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 3:41:14 PM
Creation date
9/12/2003 8:05:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
05/03/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work to Be Completed on Old Town Hall <br /> Improvement Estimates <br /> <br />Basement Area <br /> <br />Structural Supports <br />Change current supports under laminated beams to 6" x 6" posts, add 2 additional <br />posts and install new footings per drawing. <br /> <br />Insulation <br />Insulate with a minimum of R15 value around perimeter, including ends of floor <br />joists. Recommended insulation is polystyrene (foam). An acceptable fire barrier <br />shall be installed over the finished insulation. <br /> <br />Install minimum of 5 mm poly over existing ground surfaces. <br /> <br />Heating/Air Conditioning <br />Complete ductwork from furnace to areas on main floor. <br />Install fresh air duct to furnace. <br />Install Air Conditioning Unit <br />Hot Water Heater <br /> <br />Plumbing <br />Extend current plumbing to exterior water and sewer hookupsl <br /> <br />Electrical <br />Install lighting in basement. <br /> <br />Misc. <br />Install handrail on basement stairs. <br /> <br />Hook up building to natural gas <br /> <br />Main Floor <br />Plumbing <br />Install handicap fixtures in bathroom. <br /> <br />Texture ceiling and paint. <br /> <br />Carpentry <br />Install waterproof flooring (ceramic preferred) (bathroom) <br /> <br />Sand/finish existing flooring or install commercial grade carpet in main room and <br />entryway. <br /> <br />Install wainscoting in main room and entryway per drawing; <br />Install chair rail on top of wainscot. <br /> <br />May 3, 1999 <br /> <br />$200.00 <br /> <br />$500.00 <br /> <br />Minimal <br /> <br />$10,000.00 <br /> <br />$3,000.00 <br /> <br />$200.00 <br /> <br /> $300.00 <br />$1,000.00 <br /> <br />$5,226.00 <br /> <br />$800.00 <br />$500.00 <br /> <br />$1,000 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.