Laserfiche WebLink
I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />! <br />I <br />I <br /> <br />I <br />I <br /> <br /> CASE # <br /> <br /> AWARD BIDS FOR IMPROVEMENT PROJECT #98q6 <br /> BITUMINOUS PAVING OF BISON STREET <br /> By: City Engineer Steven J. Jankowski <br /> <br />Background: <br /> <br />On Friday, May 7, 1999, bids were received from four contractors for the above-referenced <br />project that was authorized by the City Council on October 13, 1998. The following is a <br />summary of the project construction bids: <br /> <br /> W.B. Miller, Inc. $36,587.50 <br /> Hardrives, Inc. $39,880.50 <br /> North Valley, Inc. $40,665.00 <br /> Bauerly Companies $52,140.70 <br /> <br />The feasibility study had estimated the construction cost at $28,800. The low bidder is W.B. <br />Miller, Inc. at a cost of $36,587.50. Included in this bid is $8,250 for the transport of 1500 cubic <br />yards of excess material from the site to be placed at a location about 1000 feet north of the <br />project. This spoil site was the previous location of Bison Street before it was re-located <br />westward to the center of the right-of-way when that portion of the street was paved in 1996. <br />The property owner, Medard Kaisershot, feels the former road property was left too low and has <br />requested the City rectify the situation. Extra material is available from this project, however, <br />this cost was not included in the original project feasibility study. <br /> <br />Recommendation: <br /> <br />The low bidder, W.B. Miller, Inc., has successfully completed numerous paving projects within <br />the City. It is staff's recommendation that the contract be awarded to W.B. Miller, Inc. in the <br />amount of $36,587.50, and that Schedule B in the amount of $8,250.00 be paid by the City's PIR <br />Fund, separate from Improvement Project #98-16. <br /> <br />Council Action: ~}~ ~ <br /> <br />Motion to award the contract for the bituminous paving of Bison Street to W.B. Miller, Inc. in <br />the amount of $36,587.50, with Schedule B being paid from the PIR Fund. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />City Attorney <br />Director of Public Works <br />Senior Accountant <br /> <br />CC: 05/11/99 <br /> <br /> <br />