Introduction <br /> <br />The Waltek Corporation is currently undergoing an expansion of their existing facility, which <br />wilt necessitate the extension of municipal sanitary sewer and watermain. At the present time, <br />sanitary sewer is available on the west side of C.R. #57 a distance of 1,150 feet south of the <br />Waltek project. Water service is available from an existing 12-inch watermain located a distance <br />of 1,300 feet south of the Waltek project. Should the watermain be extended to the Waltek <br />project, it would be highly desirable to extend the main an additional 1,000 feet northward to <br />Sunwood Drive, thereby completing a 12-inch trunk main loop. This will provide enhanced fire <br />flows and system reliability to the Sunfish Lake businesses by furnishing them with back-up <br />water supply. The purpose of this study is to determine the feasibility and associated costs for <br />this project and propose a method of financing such. <br /> <br />Description of Improvements <br /> <br />The improvements would consist of extending the existing sanitary sewer, .which is located on <br />the west side of C.R. #57 at the intersection with 142nd Lane, northward a distance of 1,150 feet <br />to the westward extension of 144th Avenue. The sanitary sewer will be extended westward a <br />distance of 206 feet within the right-of-way obtained from Waltek for the future westward <br />extension of 144th Avenue. Watermain would be extended along the west fight-of-way of C.R. <br />#57 from its present terminus point located 800 feet north of C.R. #116 to the westward <br />extension of Sunwood Drive a distance of 2,300 feet. The watermain will be placed in a casing <br />jacked across C.R. #56 connecting to the existing 12-inch main located on the southeast coruer <br />of that intersection. All work will be performed within the county highway fight-of-way, <br />however, temporary easements may be required to facilitate construction. Traffic control will <br />need to be placed along C.R. #57 during construction, and turf restoration will be required as a <br />part of the project. Six-inch services for water service and six-inch sanitary sewer lateral shall be <br />stubbed for each of the existing properties serviced by the utility extension. <br /> <br />Estimated Project Costs <br /> <br />Appendix A contains a detail of the construction costs, which are estimated to be $111,680. In <br />addition to construction costs, project overhead of 30% is estimated and detailed below: <br /> <br />Engineering 10% <br />Staking and Inspection 7% <br />Fiscal and Legal 3% <br />Administration 5% <br />Contingencies 5% <br /> <br />There are no anticipated right-of-way costs for the project. Therefore, the total project cost is <br />anticipated to be $145,184. <br /> <br /> <br />