Laserfiche WebLink
continued operation of the one -day events places the public health, safety, or welfare, or <br />the environment in jeopardy or creates a public nuisance due to noise or other nuisance <br />factors. <br />19) The City reserves the right to enter the Subject Property for the purposes of conducting <br />inspections and obtaining necessary information pertaining to the construction and <br />operational effect of the IUP or any related event. <br />20) All costs incurred by the City in administering and enforcing this permit shall be the <br />responsibility of the Permittee and shall be paid within thirty (30) days of billing by the <br />City. <br />21) The PERMITTEE shall be responsible for removal of all outdoor storage and debris <br />within 48 hours of conclusion of event. <br />22) That the IUP shall abide by all lease terms between the PERMITTEE and the City, <br />including termination of the IUP in the event the Subject Property is needed for another <br />public purpose including, but not limited to, construction of Armstrong Boulevard. <br />The motion for the adoption of the foregoing resolution as duly seconded by Councilmember <br />, and upon vote being taken thereon, the following voted in favor thereof: <br />and the following voted against the same: <br />and the following abstained: <br />and the following were absent: <br />whereupon said resolution was declared duly passed and adopted by the Ramsey City Council, <br />this the 31st day of May, 2011. <br />RESOLUTION #11-05- <br />Page 3 of 5 <br />