Laserfiche WebLink
! <br />I <br /> <br />Site Plan Review: Mike's Woodworking <br />May 24, 1999 <br />Page 2 of 2 <br /> <br />! <br />! <br /> <br />Floodway: No portion of the lot is within a Floodway, however, the rear of the property is <br />impacted by a protected wetland. The elevation of the principal building is 5 feet above the <br />ordinary high water elevation of the protected wetland and the accessory building should <br />maintain the same elevation as the principal building. City staff is also recommending that silt <br />fence be utilized during construction of the building to protect the wetland. <br /> <br />I <br />I <br />I <br />I <br /> <br />Drainage: The survey prepared by James Kyro shows the proposed building is located within <br />40 feet of the protected wetland. Drainage from the site is toward the wetland. The wetland <br />should be protected from erosion and sedimentation during construction. Silt fence is <br />recommended. After construction, vegetation should be re-established prior to the removal of <br />the silt fence. It is encouraged to have as little mowed area around the proposed addition as <br />possible. This will provide a buffer area which will protect the wetland water quality. <br /> <br />The Planning Commission will be meeting at 7:30 p.m. on Tuesday, June 1, 1999 to consider <br />your request for site plan approval. You or your representative should be at the meeting to <br />answer any questions that may arise. I am enclosing a copy of the case cover sheet for your <br />information. Don't hesitate to call us with any questions and thank you for your cooperation in <br />this process. <br /> <br /> Respectfully, <br />! <br />· c~¥ oF mms~,¥ ~ n, ~ ~ ~ <br /> <br /> Sylvia Frolik Sean Walther <br />I Zoning Administrator City Engineer Community Development Assistant <br /> <br />Enclosure <br /> <br /> <br />