Laserfiche WebLink
CASE <br />REQUEST FOR SITE PLAN APPROVAL; CASE OF NEW LIFE CHURCH <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />The City of Ramsey has received a request for site plan approval from New Life Church. The <br />plan proposes to construct a church on the east side of T.H. #47, at 172nd. The following items <br />are enclosed: <br /> <br />a) <br />b) <br />c) <br />d) <br /> <br />Site location map <br />Site Plan <br />City Staff Review Letter dated June 30, 1999 <br />Draft Planning Commission meeting minutes dated July 6, 1999 <br /> <br />e) Proposed development permit <br /> <br />Notification: <br /> <br />Site Plans are not required to be subjected to public hearings. <br /> <br />Observations: <br /> <br />The site is 10 acres in size. One access is proposed onto T.H. #47 and the plans have been <br />forwarded to Mn/DOT for comment. The church building is proposed to be 13,136 square feet <br />in size and exterior walls will consist of a combination of rock face and single scored block. The <br />facility will be served by an on-site septic system and well. <br /> <br />The area of the building and the paved parking lot do not exceed the 25% impervious surface <br />restriction in this area. The structure meets all building setback requirements, however, the <br />placement is also affected by landscaping requirements. City Code requires a 40 foot landscaped <br />buffer area between non-residential uses and residentially zoned property. Although the parcel <br />to the south is occupied by Wirz' Nursery, it is zoned residential and therefore the standard 10 <br />foot side yard setback increases to 40 feet. Subsequent to receiving the City Staff Review Letter <br />and prior to the Planning Commission meeting on July 6, the applicant modified the site plan to <br />provide the 40 foot buffer between the church and the adjacent property to the south. <br /> <br />In accordance with City Code, a sufficient number of off-street parking spaces are provided and <br />all traveled surfaces of the lot will be paved with bituminous. With the exception of a parking <br />lot expansion area in the northeast comer of the parking lot, all bituminous Surfaces are proposed <br />to be finished with B 6/12 concrete curbing. Staff has recommended that the parking lot <br />expansion area be finished with a bituminous berm. <br /> <br /> <br />