Laserfiche WebLink
! <br /> <br />I <br />I <br /> <br />Sanitary Sewer <br /> <br />1250 feet <br />4 each <br />4 each <br />60 feet <br /> <br />APPENDIX A <br /> <br />DETAIL OF TOTAL PROJECT COSTS <br /> <br />8" sanitary sewer ~ $15/foot <br />Standard manholes ~ $1,500/each <br />Service connection ~ $50/each <br />4" service lateral ~ $10/foot <br /> <br />$18,750 <br /> 6,000 <br /> 200 <br /> 600 <br /> <br />$25,550 <br /> <br />Watermain <br /> <br /> 2300 feet <br /> 4 each <br /> 5 each <br /> 100 feet <br /> <br />12" watermain ~ $20/foot <br />12" valves ~ $1,200/each <br />Standard hydrant w/valve @ $1,500/each <br />B&J casing pipe ~ $125/foot <br /> <br />$46,000 <br />4,800 <br />7,500 <br />12,500 <br />$70,800 <br /> <br />Miscellaneous <br /> <br />Lump Sum <br />2.5 Acres <br />590 yards2 <br /> <br />Provide traffic control <br />Turf restoration ~ $1,300/acre <br />Driveway restoration @ $12/yard2 <br /> <br />$ 5,000 <br /> 3,250 <br /> 7,080 <br />$15,330 <br /> <br />Total Project Construction Costs <br />Overhead <br />Total Project Cost <br /> <br />$111,680 <br /> 33,504 <br /> <br />$145,184 <br /> <br /> <br />