My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/1999
Ramsey
>
Public
>
Agendas
>
Council
>
1999
>
Agenda - Council - 10/26/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 3:46:58 PM
Creation date
9/12/2003 10:58:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO ~ RPClSEY <br /> <br />Hak~nson <br />Anderson <br />As.soc.,inc. <br /> <br />Civil & Municipal En~neerin8 <br />L~nd Surveying <br /> <br />3601 Thurs~on Avenue <br />Suite 101 <br />Anok~, Minnesota $$303 <br />612/427.5860 <br />612/4:Z7.0.~20 Fax <br /> <br />October 14, 1999 <br /> <br />Mr. Dean Kepler <br />Director of Public Works <br />City of Ramsay <br />t5I.q3 Nowthen Blvd. NW <br />Ramsay, MN 55303 <br /> <br />RE: Apple Ridge Drainage <br /> <br />Dear Dean: <br /> <br />Last Friday, I was asked to review the proposed drainage swale between Lots 1 and 2, <br />Block 1 and Lots 9 and 10, Block 1 in APPLE RIDGE by Mr. Steve Jankowski, I also met <br />with Steve on the site to review the discharge area and impacts on the adjacent lots. <br />Based on my' review and inspection of the site, I would recommend the following conditions <br />be met if the swale is allowed to be constructed: <br /> <br />1) <br /> <br />2) <br /> <br />The minimum grade of the swale should not be Jess than one percent. The <br />proposed plan shows grades less that one percent, <br /> <br />Additional topography must be provided to the north to determine at what elevation <br />the receiving pond overflows. <br /> <br />3) <br /> <br />The pending area, if it does no! overflow to the north at an elevation of two feet <br />below the low floor elevation of the house on Lot 9, Block 1, APPLE RIDGE must <br />be sized to handl.e the cdtical event as outlined by the Lower Rum River Watershed <br />Management Organization, <br /> <br />4) <br /> <br />5) <br /> <br />Drainage easements must be provid?d for the pending area and[or the drainage <br />overflow swale, / "' <br /> / <br />It is my understanding' that retaining' ,trolls are to be installed on Lots 1 & 2, Block <br />1 APPLE RIDGE. These were not shbwn on the plan. All property owners should <br />agree on proposed construction and ~mvide waivers of trespass to allow for the <br />construction. <br /> <br />t~O~ ~hmr~d doc aWlunlclparC, RkM $ EY~OIVa901 dk.d oc <br /> <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.