Laserfiche WebLink
PW CASE <br /> <br />UPDATE OF RIVER PINES ISSUES <br />By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />There are currently two issues relative to this subdivision, both of which are associated with <br />grading issues. The first deals with the grading in the vicinity of Lot 9, Block 1 of the Apple <br />Ridge subdivision. A meeting was held on October 7, 1999, between the City of Ramsey and <br />Orin Thompson Homes. At that meeting, a revised grading plan was proposed by Orin <br />Thompson. The City indicated it would review the plan and respond to the proposal. Enclosed <br />are two memorandums reviewing the plan, one from the City Engineer and a second review from <br />Peter Raatikka of Hakanson Anderson Associates, Inc. The Director of Public Works and the <br />City Attorney anticipate formulating a written response to Orin Thompson by Monday, October <br />18. A copy of that response will be available at the meeting. The second grading issue concerns <br />the grades that exist along the western boundary of the River Pines subdivision with the existing <br />Halls Dover Acres subdivision. The City Engineer has prepared a memorandum on the situation, <br />which is also attached to this case. <br /> <br />Committee Action: <br /> <br />Based on discussion. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />City Attorney <br />Director of Public Works <br /> <br />PW: 10/19/99 <br /> <br /> <br />