My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/16/1999
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
1998 - 1999
>
1999
>
Agenda - Public Works Committee - 11/16/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:23:59 PM
Creation date
9/15/2003 8:38:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subd. 2. The City may impose any reasonable conditions upon the <br />issuance of a Permit and the performance of the applicant <br />thereunder in order to protect the public health, safety and <br />welfare, to ensure the structural integrity of the Right-of-Way, to <br />protect the property and safety of other users of the Right-of-Way, <br />to minimize the disruption and inconvenience to the traveling <br />public, and to otherwise efficiently manage use of the Right-of- <br />Way. <br /> <br />Sec. 4.10.12. Permit Fees. <br /> <br />Subd. 1. Excavation Permit Fee. The Excavation Permit Fee shall <br />be established by the City in an amount sufficient to recover the <br />following costs: <br /> <br />(1) The City Cost; <br /> <br />The degradation of the Right-of-Way that will result <br />from the Excavation; <br /> <br />(3) <br /> <br />Restoration, if done or caused to be done by the <br />City. <br /> <br />Subd. 2. Obstruction Permit Fee. The Obstruction Permit Fee shall <br />be established by the City and shall be in an amount sufficient to <br />recover the City Cos~ <br /> <br />Subd. 3. Disruption Fees. The City may establish and impose a <br />disruption fee as a penalty for unreasonable delays in Excavations, <br />Obstructions, or Restoration. <br /> <br /> Subd. 4. Payment of Permit Fees. No Excavation Permit or <br /> Obstruction Permit shall be issued without payment of all fees <br /> required prior to the issuance of such a Permit unless the <br /> Applicant shall agree (in a manner, amount, and substance <br /> acceptable to the City) to pay such fees within thirty (30) days of <br /> billing therefor. All Permit fees shall be doubled during a <br /> probationary period. Permit fees that were paid for a Permit which <br /> was revoked for a breach are not refundable. Any refunded Permit <br /> Fees shall be less all City Cost up to and including the date of <br /> refund. <br /> <br />~ Subd. $. Use of Permit Fees. Ail Obstruction and Excavation <br />I Permit Fee~s--~al~y for city management, construction, <br />~_maintenance and Restoration costs of the Right-of-Way. <br /> <br />Sec. 4.10.13. Right-of-Way Restoration. <br /> <br />Subd. 1. The work to be done under the Permit, and the Restoration <br />of the Right-of-Way as required herein, must be completed within <br />the dates specified in the Permit, increased by as many days as <br />work could not be done because of circumstances constituting force <br /> <br />11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.