Laserfiche WebLink
Subd. 2. Registrants who join in and during a scheduled <br />Obstruction or Excavation performed by the City, whether or not it <br />is a joint application by two or more Registrants or a single <br />application, are not required to pay the Obstruction and <br />Degradation portions of the Permit Fee. <br /> <br />Subd. 3. Registrants who apply for Permits for the same <br />Obstruction or Excavation, which is not performed by the City, may <br />share in the payment of the Obstruction or Excavation Permit Fee. <br />Registrants must agree among themselves as to the portion each will <br />pay and indicate the same on their applications. <br /> <br />Sec. 4.10.15. Supplementary Applications. <br /> <br />Subd. 1. A Right-of-Way Permit is valid only for the area of the <br />Right-of-Way specified in the Permit. No Permittee may perform any <br />work outside the area specified in the Permit, except as provided <br />herein. Any Permittee which determines that an area greater than <br />that specified in the Permit must be Obstructed or Excavated must <br />before working in that greater area (i) make application for a <br />Permit extension and pay any additional fees necessitated thereby, <br />and (ii) be granted a new Permit or Permit extension. <br /> <br />Subd. 2. A Right-of-Way Permit is valid only for the dates <br />specified in the Permit. No Permittee may begin its work before <br />the Permit start date or, except as provided herein, continue <br />working after the end date. If a Permittee does not finish the <br />work by the Permit end date, it must make application for a new <br />Permit for the additional time it needs, and receive the new Permit <br />or an extension of the old Permit before working after the end date <br />of the previous Permit. This Supplementary Application must be <br />done before the Permit end date. <br /> <br />See. 4.10.16. Other Obligations. <br /> <br />Subd. 1. Obtaining a Right-of-Way Permit does not relieve <br />Permittee of its duty to obtain all other necessary Permits, <br />licenses, franchises or other authorizations and to pay all fees <br />required by the City, any other City, County, State or Federal <br />rules, laws or regulations. A Permittee shall comply with all <br />requirements of local, state and federal laws, including Minn. <br />Stat. §§216D.01-09 ("One Call Excavation Notice System"). A <br />Permittee shall perform all work in conformance with all applicable <br />codes and established rules and regulations, and is responsible for <br />all work done in the Right-of-Way pursuant to its Permit, <br />regardless of who performs the work. <br /> <br />Subd. 2. Except in the case of an Emergency, and with the approval <br />of the City, no Right-of-Way Obstruction or Excavation may be <br />performed when seasonally prohibited or when conditions are <br />unreasonable for such work. <br /> <br />14 <br /> <br /> <br />