My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/17/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 05/17/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:16:42 AM
Creation date
5/13/2011 5:09:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C, Wet ponding credit - An adjustment of up to twenty-five percent (25%) will be <br />made to the storm water utility fee of a parcel for onsite measures which are owned and <br />maintained by the applicant that effectively reduces the amount of sediments/nutrients that <br />enter the system. No adjustments will be made to single family, duplex residential, and <br />agricultural parcels. It is the responsibility of the applicant to prove that the wet pond in <br />question meets the following design criteria, <br />I. Permanent Pool Volume: The volume of the permanent pool ("dead storage") should <br />be at least 1.3 and preferably up to 2.5 times greater than the runoff volume generated <br />from a 0,34 inch rainfall event (average summer storm) over the pond tributary area. <br />II, Permanent Pool Depth: To promote settling and provide space for sediment <br />accumulation, the average depth (volume/area) of the permanent pool should be at least <br />4 feet with a maximum depth of 10 feet, <br />III, Pond Shape: The pond should be wedge shaped, narrowest at the inlet and <br />widest at the outlet, A minimum length to width ratio of 3:1 should be used. The <br />distance between storm sewer outfalls and the pond outlet should be maximized to <br />prevent short-circuiting. <br />IV, Detention Time: The pond should provide a detention time of at least 6 hours, <br />V, Skimming: The pond should have some type of facility to retain oils and floatable <br />debris. This facility will be maintained by the applicant. Skimming shall be considered <br />adequate if a baffle structure extends at 'least 4 inches below the normal water surface <br />and the velocity of water passing under the baffle does not exceed 0,5 feet per second <br />for the one year rainfall event. <br />VI, Emergency Overflow: An emergency overflow structure or stabilized spillway <br />will be provided to accommodate discharges during a storm event greater than a 2,5 <br />inch rainfall, <br />VII. Side Slopes: For purposes of stability, the side slopes should not exceed three <br />feet horizontal to one foot vertical, <br />The motion for the adoption of the foregoing resolution as duly seconded by Councilmember <br />Anderson, and upon vote being taken thereon, the following voted in favor thereof: <br />Mayor Game° <br />Councilmember Connolly <br />Councilmember Anderson <br />Councilmember Hendriksen <br />Resolution #00-07-172 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.