My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/17/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 05/17/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:16:42 AM
Creation date
5/13/2011 5:09:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 5. 2. <br />Meeting Date: 05/17/2011 <br />By: <br />Title: <br />Len Linton, Engineering/Public Works <br />Consider Installing Permanent Power for Happy Days Celebration <br />Background: <br />The Happy Days Committee rents portable generators to provide power for the stage show, food vendors and <br />inflatable attractions. They are planning to rent three (3) generators for 2011. Staff was asked to investigate <br />installing underground power to the site. We contacted Connexus Energy and asked for a quote to provide three <br />(3) service locations to match the generator placement. Their quote will provide cable to the meter location. The <br />City will need to hire an electrician to install the wire from the meter to the service panel locations. We contacted <br />Rapid Electric who performes electrical work for the City to get an estimate for setting the service panels and <br />connecting to the meters. <br />We used the attached map for 2010 to develop the estimate. The location of the inflatables has not been determined <br />for 2011. <br />The estimate for the generators for 2011 is $3,500. The estimate from Connexus is $8,300. The estimate from <br />Rapid electric is $3,000. There will be City Permit fees of $500. The total estimate for installing permanent power <br />to the site is $13,000. There will be monthly service charges once the permanent power is installed. <br />The cost of installing permanent power is 4 times the projected rental rate for 2011. <br />Notification: <br />Observations: <br />Funding Source: <br />The proposed funding source is the Happy Days fund. <br />Staff Recommendation: <br />Staff recommends evaluating the the long term plans for the COR and Happy Days. The decision on installing <br />permanent power should complement the long term plans. <br />Committee Action: <br />Motion based on discussion. <br />2010 Map <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 05/10/2011 12:59 PM <br />KurtUlrich Jo Thieling 05/12/2011 12:01 PM <br />Form Started By: Len Linton Started On: 05/10/2011 08:54 AM <br />Final Approval Date: 05/12/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.