My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/17/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 05/17/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:16:42 AM
Creation date
5/13/2011 5:09:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E � �C^O'�NNEXUS® <br />VE E GY <br />Your Community Energy Partner <br />Mr. Tim Himmer <br />City of Ramsey <br />7550 Sunwood Dr NW <br />Ramsey MN 55303 <br />Dear Mr. Himmer, <br />14601 Ramsey Boulevard <br />Ramsey, Minnesota 55303 <br />763-323-2600 <br />Fax: 763-506-9541 <br />1-800-642-1672 <br />www.connexusenergy.com <br />info@connexusenergy.com <br />April 13, 2011 <br />I have prepared the following proposal to install streetlights at the Bunker Blvd <br />intersections of Azurite and Basalt. Connexus Energy will install, retain ownership, and <br />will provide ongoing maintenance of the lights under our monthly energy and <br />maintenance rate. The installation costs shown below are a preliminary estimate prior to <br />the final design by Connexus Energy's engineering department. <br />2 —250 W High pressure sodium commercial shoebox lights on 30' square <br />fiberglass poles, bronze in color. $8,624.00 <br />The above pricing includes 632' of lighting conductor and a directional bore at Basalt. If <br />we are able to place pipe crossings at Basalt during construction to eliminate the bore, <br />the cost will be reduced by $800.00 <br />The monthly energy and maintenance rates for the lights will be $12.72 per light, per <br />month. The lights will be installed to utility specifications and will operate on a dusk -to - <br />dawn schedule. The above installation costs are based upon our best practices. If job <br />site conditions beyond our control prevent normal installation procedures or if winter <br />construction is required, additional charges may be applied. The manufacturer's lead <br />time for material is 6 to 8 weeks. <br />Please indicate your acceptance of this proposal by returning a signed copy via, <br />USPS, Fax 763-506-9541, or e-mail: leoo@connexusenergy.com <br />hope that this information is satisfactory for you. Do not hesitate to contact me if you <br />have any questions. <br />Sincerely, <br />Leo Offerman <br />CEM <br />Digitally signed by Leo Offerman CEM <br />DN: cn=Leo 0fferman CEM, o=Connexus <br />Energy, ou, <br />email=leoo@connexusenergy.com, c=US <br />Date: 2011.04.13 16:12:46 -05'00' <br />Utility Services Representative <br />Accepted by: <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.