Laserfiche WebLink
�C^O'�NRNEXUS® <br />VER E GY <br />Your Community Energy Partner <br />Mr. Tim Himmer <br />City of Ramsey <br />7550 Sunwood Dr NW <br />Ramsey MN 55303 <br />Dear Mr. Himmer, <br />14601 Ramsey Boulevard <br />Ramsey, Minnesota 55303 <br />763-323-2600 <br />Fax: 763-506-9541 <br />1-800-642-1672 <br />www.connexusenergy.com <br />info@connexusenergy.com <br />March 7, 2011 <br />I have prepared the following REVISED proposal to install streetlights at the <br />intersections listed below in conjunction with the Bunker Blvd reconstruction project. <br />Connexus Energy will install, retain ownership, and will provide ongoing maintenance of <br />the lights under our monthly energy and maintenance rate. The installation costs shown <br />below are a preliminary estimate prior to the final design by Connexus Energy's <br />engineering department. <br />Magnesium and Bunker Lake Blvd <br />1 -250W HPS Shoebox on a 30' SQ fiberglass pole including a 420' bore. $5,550.00 <br />Tungsten and Bunker Lake Blvd <br />1 -250W HPS Shoebox on a 30' SQ fiberglass pole including a 120' bore. $2,675.00 <br />Wolfram and Bunker Lake Blvd <br />1 -250W HPS Shoebox on a 30' SQ fiberglass pole including a 220' bore. $4,480.00 <br />142nd and Sunfish <br />1 -250W HPS Shoebox on a 30' square fiberglass pole. $1,525.00 <br />Unity and Bunker Lake Blvd <br />1 -250W HPS Shoebox on a 30' SQ fiberglass pole, including credit <br />for the retirement of a 14' Traditionaire light. $1,599.00 <br />The first four intersections listed above were each credited $574.00 for the retirement of the <br />existing cobra head lights, for a total credit of $2, 296.00. <br />The monthly energy and maintenance rate for the 250W HPS lights is $12.72 per light, <br />per month. The lights will be installed to utility specifications and will operate on a dusk - <br />to -dawn schedule. The above installation costs are based upon our best practices. If <br />job site conditions beyond our control prevent normal installation procedures or if winter <br />construction is required, additional charges may be applied. The manufacturer's lead <br />time for material is 6 to 8 weeks. <br />Please indicate your acceptance of this proposal by returning a signed copy via <br />USPS, or e-mail: leoo@connexusenergy.com <br />I hope that this information is satisfactory for you. Do not hesitate to contact me if you <br />have any questions. <br />Sincerely, <br />Leo Offerman <br />Digitally signed by Leo Offerman <br />DN: cn=Leo Offerman, o=Connexus <br />Energy, ou=Utility Services <br />Representative, <br />email=leoo@connexusenergy, c=US <br />Date: 2011.03.07 16:05:32 -06'00' <br />Accepted by: <br />Date: <br />