Laserfiche WebLink
IP 10-07 ALPINE DRIVE/ ROANOKE STREET IMPROVEMENTS <br />City of Ramsey <br />May 23, 2011 <br />Pay Estimate No. 2 <br />Bid <br />Change Order <br />With Change Order <br />$437,833.43 Total <br />$1,255.50 $187,808.45 <br />$437,833.43 $1,255.50 $187,808.45 <br />This Pay Application Completed to Date <br />IP 10-07 ALPINE DRIVE/ ROANOKE STREET IMPROVEMENTS CONTRACT <br />ITEM UNIT QTY UNIT COST EXTENSION <br />MOBILIZATION LS 1 8,000.00 8,000.00 0.00 0.00 0.50 4,000.00 <br />REMOVE TREES EACH 16 95.00 1,520.00 0.00 0.00 2.00 190.00 <br />GRUB TREES EACH 16 55.00 880.00 0.00 0.00 0.00 0.00 <br />REMOVE CONCRETE CURB AND GUTTER LF 1924 2.00 3,848.00 0.00 0.00 541.00 1,082.00 <br />REMOVE 12 - 18 INCH RCP LF 83 3.00 249.00 0.00 0.00 0.00 0.00 <br />REMOVE 21 - 24 INCH RCP LF 166 3.00 498.00 0.00 0.00 138.00 414.00 <br />REMOVE BITUMINOUS PAVEMENT SQ YD 2273 2.00 4,546.00 0.00 0.00 1,835.10 3,670.20 <br />REMOVE 2 X 3 CATCHBASIN EACH 13 100.00 1,300.00 0.00 0.00 9.00 900.00 <br />REMOVE 60" STORM MANHOLE EACH 1 200.00 200.00 0.00 0.00 0.00 0.00 <br />SAWING BITUMINOUS PAVEMENT LIN FT 760 1.50 1,140.00 0.00 0.00 330.00 495.00 <br />SALVAGE SIGN EACH 29 30.00 870.00 0.00 0.00 0.00 0.00 <br />COMMON EXCAVATION (TRAIL CONSTRUCTION) CY 1375 10.05 13,818.75 0.00 0.00 0.00 0.00 <br />COMMON BORROW IMPORT CY 300 8.00 2,400.00 0.00 0.00 0.00 0.00 <br />EXPORT SOILS (TRAIL CONSTRUCTION) CY 72 6.00 432.00 0.00 0.00 126.00 756.00 <br />GEOTEXTILE FABRIC TYPE V (TRAIL CONSTRUCTION) SY 500 1.00 500.00 0.00 0.00 0.00 0.00 <br />4" AGGREGATE BASE, CLASS 5 TON 477 12.00 5,724.00 0.00 0.00 337.79 4,053.48 <br />4" AGGREGATE BASE, CLASS 5 TRAIL CONSTRUCTION TON 2135 9.65 20,602.75 0.00 0.00 0.00 0.00 <br />MILL BITUMINOUS SURFACE 0" - 1.5", 7 FEET WIDE SQ YD 11168 0.83 9,269.44 0.00 0.00 6,088.00 5,053.04 <br />MILL BITUMINOUS SURFACE 1.5" ,FULL WIDTH SQ YD 4927 0.92 4,532.84 0.00 0.00 5,650.00 5,198.00 <br />2" NON -WEARING COURSE LV3NW35030BR TON 272 47.35 12,879.20 0.00 0.00 211.81 10,029.20 <br />1.5" WEARING COURSE LV4WE4503OB TON 3200 52.55 168,160.00 0.00 0.00 2,034.49 106,912.45 <br />2.5" WEARING COURSE LV4WE45030B TRAIL CONSTRUCTION TON 1115 56.20 62,663.00 0.00 0.00 0.00 0.00 <br />BITUMINOUS MATERIAL FOR TACK COAT GAL 1770 2.50 4,425.00 0.00 0.00 980.00 2,450.00 <br />15" RC PIPE SEWER, DESIGN 3006 LIN FT 239 22.00 5,258.00 0.00 0.00 160.00 3,520.00 <br />18" RC PIPE SEWER, DESIGN 3006 LIN FT 146 24.00 3,504.00 0.00 0.00 176.00 4,224.00 <br />21" RC PIPE SEWER, DESIGN 3006 LIN FT 119 27.00 3,213.00 0.00 0.00 92.00 2,484.00 <br />24" RC PIPE SEWER, DESIGN 3006 LIN FT 62 29.00 1,798.00 0.00 0.00 64.00 1,856.00 <br />CONSTRUCT 2' x 3' STORM CATCH BASIN EACH 4 590.00 2,360.00 0.00 0.00 1.00 590.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020/4022 EACH 11 950.00 10,450.00 0.00 0.00 12.00 11,400.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 54-4020/4022 EACH 1 1,300.00 1,300.00 0.00 0.00 1.00 1,300.00 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020/4022 EACH 1 2,000.00 2,000.00 0.00 0.00 0.00 0.00 <br />CONSTRUCT RCP FLARED END SECTION 24 INCH EACH 1 498.00 498.00 0.00 0.00 1.00 498.00 <br />F&I CASTING ASSEMBLY (STORM) EACH 16 528.00 8,448.00 0.00 0.00 4.00 2,112.00 <br />