My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/31/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 05/31/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:05:57 PM
Creation date
5/26/2011 6:43:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/31/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CONNNEXUS® <br />ENERGY <br />Your Community Energy Partner <br />Mr. Tim Himmer <br />City of Ramsey <br />7550 Sunwood Dr NW <br />Ramsey MN 55303 <br />Dear Mr. Himmer, <br />14601 Ramsey Boulevard <br />Ramsey, Minnesota 55303 <br />763-323-2600 <br />Fax: 763-506-9541 <br />1-800-642-1672 <br />www.connexusenergy.com <br />info@cc n nexusenergy. com <br />April 27, 2011 <br />I have prepared the following REVISED proposal to install streetlights on Dysprosium <br />St. as shown on the attached sketch. Connexus Energy will install, retain ownership, <br />and will provide ongoing maintenance of the lights under our monthly energy and <br />maintenance rate. The installation costs shown below are a preliminary estimate prior to <br />the final design by Connexus Energy's engineering department. <br />5 —100 W High pressure sodium Traditionaire style lights on standard 14' fiberglass <br />poles $13,395.00 <br />The monthly energy and maintenance rates for the lights will be $7.76 per light, per <br />month. The lights will be installed to utility specifications and will operate on a dusk -to - <br />dawn schedule. The above installation costs are based upon our best practices. If job <br />site conditions beyond our control prevent normal installation procedures or if winter <br />construction is required, additional charges may be applied. The manufacturer's lead <br />time for material is 6 to 8 weeks. <br />Please indicate your acceptance of this proposal by returning a signed copy via, <br />USPS, Fax 763-506-9541, or e-mail: leoo@connexusenergy.com <br />I hope that this information is satisfactory for you. Do not hesitate to contact me if you <br />have any questions. <br />Sincerely, <br />igitally stgned bfCEM <br />Leo Offerman D00: cn=Leo Offermy an Leo COEfEM, o=Cermanonnexus <br />Energy, m <br />gy, ou, <br />ema l=leoo@connexusenergy.co, c =lj <br />CEM Date: 2ml.04.2712:56:50-05'00' ccepted by: <br />Utility Services Representative <br />Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.