Laserfiche WebLink
Project: 01973-00 - RAMSEY - Armstrong and Bunker Lake Boulevard Int and Extensions <br />Engineers Estimate <br />Douglas -Kerr Underground, <br />LLC <br />R. L. Larson Excavating, <br />Inc. <br />Redstone Construction <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />130 <br />2564.554 <br />SNOW PLOW MARKER X4-5 <br />EACH <br />7 <br />$50.00 <br />$350.00 <br />$75.00 <br />$525.00 <br />$80.00 <br />$560.00 <br />$50.00 <br />$350.00 <br />131 <br />2565.511 <br />TRAFFIC CONTROL SIGNAL SYSTEM <br />SIG SYS <br />1 <br />$220,000.00 <br />$220,000.00 <br />$264,150.00 <br />$264,150.00 <br />$269,500.00 <br />$269,500.00 <br />$245,050.00 <br />$245,050.00 <br />132 <br />2565.601 <br />EMERGENCY VEHICLE PREEMPTION SYSTEM <br />LUMP SUM <br />1 <br />$10,000.00 <br />$10,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />$40,000.00 <br />$40,000.00 <br />133 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LIN FT <br />2615 <br />$2.00 <br />$5,230.00 <br />$1.45 <br />$3,791.75 <br />$1.60 <br />$4,184.00 <br />$1.55 <br />$4,053.25 <br />134 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />64 <br />$250.00 <br />$16,000.00 <br />$100.00 <br />$6,400.00 <br />$75.00 <br />$4,800.00 <br />$75.00 <br />$4,800.00 <br />135 <br />2573.540 <br />FILTER LOG TYPE WOOD FIBER BIOROLL <br />LIN FT <br />654 <br />$4.00 <br />$2,616.00 <br />$2.95 <br />$1,929.30 <br />$3.00 <br />$1,962.00 <br />$2.75 <br />$1,798.50 <br />136 <br />2573.602 <br />CULVERT PROTECTION <br />EACH <br />13 <br />$250.00 <br />$3,250.00 <br />$250.00 <br />$3,250.00 <br />$75.00 <br />$975.00 <br />$75.00 <br />$975.00 <br />137 <br />2575.501 <br />SEEDING <br />ACRE <br />15.5 <br />$200.00 <br />$3,100.00 <br />$150.00 <br />$2,325.00 <br />$120.00 <br />$1,860.00 <br />$115.00 <br />$1,782.50 <br />138 <br />2575.502 <br />SEED MIXTURE 240 <br />POUND <br />900 <br />$1.50 <br />$1,350.00 <br />$1.99 <br />$1,791.00 <br />$2.00 <br />$1,800.00 <br />$1.90 <br />$1,710.00 <br />139 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />470 <br />$2.00 <br />$940.00 <br />$1.55 <br />$728.50 <br />$2.00 <br />$940.00 <br />$1.50 <br />$705.00 <br />140 <br />2575.502 <br />SEED MIXTURE 310 <br />POUND <br />30 <br />$3.00 <br />$90.00 <br />$14.30 <br />$429.00 <br />$15.00 <br />$450.00 <br />$14.00 <br />$420.00 <br />141 <br />2575.502 <br />SEED MIXTURE 350 <br />POUND <br />50 <br />$2.50 <br />$125.00 <br />$3.65 <br />$182.50 <br />$5.00 <br />$250.00 <br />$4.00 <br />$200.00 <br />142 <br />2575.511 <br />MULCH MATERIAL TYPE 1 <br />TON <br />32 <br />$200.00 <br />$6,400.00 <br />$175.00 <br />$5,600.00 <br />$170.00 <br />$5,440.00 <br />$165.00 <br />$5,280.00 <br />143 <br />2575.519 <br />DISK ANCHORING <br />ACRE <br />13.5 <br />$150.00 <br />$2,025.00 <br />$75.00 <br />$1,012.50 <br />$60.00 <br />$810.00 <br />$50.00 <br />$675.00 <br />144 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />4545 <br />$1.50 <br />$6,817.50 <br />$0.96 <br />$4,363.20 <br />$0.90 <br />$4,090.50 <br />$0.85 <br />$3,863.25 <br />145 <br />2575.532 <br />FERTILIZER TYPE 3 <br />POUND <br />6250 <br />$1.00 <br />$6,250.00 <br />$0.39 <br />$2,437.50 <br />$0.50 <br />$3,125.00 <br />$0.45 <br />$2,812.50 <br />146 <br />2575.532 <br />FERTILIZER TYPE 4 <br />POUND <br />100 <br />$3.00 <br />$300.00 <br />$1.00 <br />$100.00 <br />$1.00 <br />$100.00 <br />$0.85 <br />$85.00 <br />147 <br />2575.570 <br />RAPID STABILIZATION METHOD 2 <br />ACRE <br />2.5 <br />$1,100.00 <br />$2,750.00 <br />$950.00 <br />$2,375.00 <br />$1,000.00 <br />$2,500.00 <br />$950.00 <br />$2,375.00 <br />148 <br />2582.501 <br />PAVT MSSG (LT ARROW) PREFORMED THERMOPLASTIC <br />EACH <br />9 <br />$300.00 <br />$2,700.00 <br />$400.00 <br />$3,600.00 <br />$400.00 <br />$3,600.00 <br />$400.00 <br />$3,600.00 <br />149 <br />2582.501 <br />PAVT MSSG (RT ARROW) PREFORMED THERMOPLASTIC <br />EACH <br />9 <br />$300.00 <br />$2,700.00 <br />$400.00 <br />$3,600.00 <br />$400.00 <br />$3,600.00 <br />$400.00 <br />$3,600.00 <br />150 <br />2582.502 <br />4" SOLID LINE WHITE -PAINT <br />LIN FT <br />19800 <br />$0.20 <br />$3,960.00 <br />$0.10 <br />$1,980.00 <br />$0.10 <br />$1,980.00 <br />$0.15 <br />$2,970.00 <br />151 <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW -PAINT <br />LIN FT <br />18150 <br />$0.40 <br />$7,260.00 <br />$0.28 <br />$5,082.00 <br />$0.30 <br />$5,445.00 <br />$0.30 <br />$5,445.00 <br />152 <br />2582.502 <br />24" STOP LINE WHITE -PREFORMED THERMOPLASTIC <br />LIN FT <br />240 <br />$8.00 <br />$1,920.00 <br />$18.00 <br />$4,320.00 <br />$20.00 <br />$4,800.00 <br />$18.00 <br />$4,320.00 <br />153 <br />2582.502 <br />24" SOLID LINE YELLOW -PREFORMED THERMOPLASTIC <br />LIN FT <br />1925 <br />$8.00 <br />$15,400.00 <br />$8.00 <br />$15,400.00 <br />$8.00 <br />$15,400.00 <br />$8.00 <br />$15,400.00 <br />154 <br />2582.502 <br />4" SOLID LINE WHITE -EPDXY <br />LIN FT <br />17610 <br />$0.50 <br />$8,805.00 <br />$0.32 <br />$5,635.20 <br />$0.35 <br />$6,163.50 <br />$0.32 <br />$5,635.20 <br />155 <br />2582.502 <br />4" BROKEN LINE WHITE -EPDXY <br />LIN FT <br />550 <br />$0.50 <br />$275.00 <br />$0.32 <br />$176.00 <br />$0.35 <br />$192.50 <br />$0.32 <br />$176.00 <br />156 <br />2582.502 <br />8" DOTTED LINE WHITE -EPDXY <br />LIN FT <br />120 <br />$0.85 <br />$102.00 <br />$3.00 <br />$360.00 <br />$3.00 <br />$360.00 <br />$3.00 <br />$360.00 <br />157 <br />2582.502 <br />4" SOLID LINE YELLOW -EPDXY <br />LIN FT <br />5270 <br />$0.50 <br />$2,635.00 <br />$0.33 <br />$1,739.10 <br />$0.35 <br />$1,844.50 <br />$0.33 <br />$1,739.10 <br />158 <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW -EPDXY <br />LIN FT <br />6810 <br />$1.00 <br />$6,810.00 <br />$0.66 <br />$4,494.60 <br />$0.70 <br />$4,767.00 <br />$0.66 <br />$4,494.60 <br />159 <br />2582.503 <br />CROSSWALK MARKING -PREFORMED THERMOPLASTIC <br />SQ FT <br />1360 <br />$12.00 <br />$16,320.00 <br />$16.00 <br />$21,760.00 <br />$16.00 <br />$21,760.00 <br />$16.00 <br />$21,760.00 <br />Total Base Bid: <br />$3,646,702.70 <br />$3,458,170.43 <br />$3,496,547.40 <br />$3,618,367.35 <br />Total Base Bid: $3,646,702.70 $3,458,170.43 $3,496,547.40 $3,618,367.35 <br />Totals for Project 01973-00 <br />$3,646,702.70 <br />$3,458,170.43 <br />$3,496,547.40 <br />$3,618,367.35 <br />% of Estimate for Project 01973-00 <br />-5.17% <br />-4.12% <br />-0.78% <br />Page 5 <br />