|
Project: 01973-00 - RAMSEY - Armstrong and Bunker Lake Boulevard Int and Extensions
<br />Engineers Estimate
<br />Forest Lake Contracting, Inc.
<br />Veit & Company, Inc.
<br />Geislinger and Sons, Inc.
<br />Item No.
<br />Item
<br />Units
<br />Quantity
<br />Unit Price
<br />Total Price
<br />Unit Price
<br />Total Price
<br />Unit Price
<br />Total Price
<br />Unit Price
<br />Total Price
<br />105
<br />2511.501
<br />RANDOM RIPRAP CLASS III
<br />CU YD
<br />6.3
<br />$200.00
<br />$1,260.00
<br />$105.00
<br />$661.50
<br />$77.00
<br />$485.10
<br />$150.00
<br />$945.00
<br />106
<br />2511.501
<br />RANDOM RIPRAP CLASS IV
<br />CU YD
<br />6
<br />$200.00
<br />$1,200.00
<br />$110.00
<br />$660.00
<br />$77.00
<br />$462.00
<br />$150.00
<br />$900.00
<br />107
<br />2521.501
<br />4" CONCRETE WALK
<br />SQ FT
<br />26523
<br />$3.00
<br />$79,569.00
<br />$2.80
<br />$74,264.40
<br />$3.00
<br />$79,569.00
<br />$3.15
<br />$83,547.45
<br />108
<br />2521.511
<br />2" BITUMINOUS WALK
<br />SQ FT
<br />104909
<br />$1.30
<br />$136,381.70
<br />$1.10
<br />$115,399.90
<br />$1.56
<br />$163,658.04
<br />$1.40
<br />$146,872.60
<br />109
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN B418
<br />LIN FT
<br />2477
<br />$10.00
<br />$24,770.00
<br />$8.70
<br />$21,549.90
<br />$11.00
<br />$27,247.00
<br />$9.20
<br />$22,788.40
<br />110
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN B418 (MOD)
<br />LIN FT
<br />108
<br />$12.00
<br />$1,296.00
<br />$20.00
<br />$2,160.00
<br />$16.00
<br />$1,728.00
<br />$11.00
<br />$1,188.00
<br />111
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN B424
<br />LIN FT
<br />4008
<br />$13.00
<br />$52,104.00
<br />$10.00
<br />$40,080.00
<br />$13.00
<br />$52,104.00
<br />$10.75
<br />$43,086.00
<br />112
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN B618
<br />LIN FT
<br />4146
<br />$12.00
<br />$49,752.00
<br />$8.80
<br />$36,484.80
<br />$11.00
<br />$45,606.00
<br />$9.20
<br />$38,143.20
<br />113
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN B618 (MODIFIED)
<br />LIN FT
<br />60
<br />$15.00
<br />$900.00
<br />$20.00
<br />$1,200.00
<br />$16.00
<br />$960.00
<br />$11.00
<br />$660.00
<br />114
<br />2531.507
<br />6" CONCRETE PAVEMENT
<br />SQ YD
<br />24
<br />$60.00
<br />$1,440.00
<br />$62.00
<br />$1,488.00
<br />$59.00
<br />$1,416.00
<br />$47.00
<br />$1,128.00
<br />115
<br />2531.602
<br />CONCRETE MEDIAN NOSE DESIGN 7109
<br />EACH
<br />3
<br />$500.00
<br />$1,500.00
<br />$350.00
<br />$1,050.00
<br />$983.00
<br />$2,949.00
<br />$275.00
<br />$825.00
<br />116
<br />2531.602
<br />CONC ENTRANCE NOSE DES 7113
<br />EACH
<br />5
<br />$500.00
<br />$2,500.00
<br />$350.00
<br />$1,750.00
<br />$636.00
<br />$3,180.00
<br />$250.00
<br />$1,250.00
<br />117
<br />2531.618
<br />TRUNCATED DOMES
<br />SQ FT
<br />96
<br />$40.00
<br />$3,840.00
<br />$32.00
<br />$3,072.00
<br />$37.00
<br />$3,552.00
<br />$30.00
<br />$2,880.00
<br />118
<br />2533.507
<br />PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337
<br />LIN FT
<br />2705
<br />$15.00
<br />$40,575.00
<br />$13.50
<br />$36,517.50
<br />$16.00
<br />$43,280.00
<br />$14.50
<br />$39,222.50
<br />119
<br />2533.508
<br />RELOCATE PORTABLE PRECAST CONC BARRIER DESIGN 8337
<br />LIN FT
<br />1730
<br />$4.00
<br />$6,920.00
<br />$3.00
<br />$5,190.00
<br />$5.00
<br />$8,650.00
<br />$3.50
<br />$6,055.00
<br />120
<br />2540.602
<br />PROTECT MAIL BOX
<br />EACH
<br />1
<br />$100.00
<br />$100.00
<br />$100.00
<br />$100.00
<br />$25.00
<br />$25.00
<br />$500.00
<br />$500.00
<br />121
<br />2554.615
<br />IMPACT ATTENUATOR
<br />ASSEMBLY
<br />6
<br />$3,000.00
<br />$18,000.00
<br />$2,400.00
<br />$14,400.00
<br />$2,745.00
<br />$16,470.00
<br />$2,650.00
<br />$15,900.00
<br />122
<br />2554.615
<br />RELOCATE IMPACTATTENUATOR
<br />ASSEMBLY
<br />4
<br />$750.00
<br />$3,000.00
<br />$400.00
<br />$1,600.00
<br />$604.00
<br />$2,416.00
<br />$750.00
<br />$3,000.00
<br />123
<br />2557.603
<br />INSTALL WOODEN FENCE
<br />LIN FT
<br />400
<br />$10.00
<br />$4,000.00
<br />$10.00
<br />$4,000.00
<br />$34.00
<br />$13,600.00
<br />$32.00
<br />$12,800.00
<br />124
<br />2563.601
<br />TRAFFIC CONTROL
<br />LUMP SUM
<br />1
<br />$80,000.00
<br />$80,000.00
<br />$13,000.00
<br />$13,000.00
<br />$10,431.00
<br />$10,431.00
<br />$16,000.00
<br />$16,000.00
<br />125
<br />2563.602
<br />RAISED PAVEMENT MARKER TEMPORARY
<br />EACH
<br />925
<br />$2.00
<br />$1,850.00
<br />$1.40
<br />$1,295.00
<br />$2.00
<br />$1,850.00
<br />$1.50
<br />$1,387.50
<br />126
<br />2564.531
<br />SIGN PANELS TYPE C
<br />SQ FT
<br />428.9
<br />$30.00
<br />$12,867.00
<br />$31.00
<br />$13,295.90
<br />$33.00
<br />$14,153.70
<br />$29.00
<br />$12,438.10
<br />127
<br />2564.537
<br />INSTALL SIGN TYPE SPECIAL
<br />EACH
<br />2
<br />$150.00
<br />$300.00
<br />$100.00
<br />$200.00
<br />$137.00
<br />$274.00
<br />$125.00
<br />$250.00
<br />128
<br />2564.550
<br />DELINEATOR TYPE X4-13
<br />EACH
<br />3
<br />$50.00
<br />$150.00
<br />$45.00
<br />$135.00
<br />$44.00
<br />$132.00
<br />$50.00
<br />$150.00
<br />129
<br />2564.552
<br />HAZARD MARKER X4-2
<br />EACH
<br />7
<br />$50.00
<br />$350.00
<br />$65.00
<br />$455.00
<br />$49.00
<br />$343.00
<br />$65.00
<br />$455.00
<br />130
<br />2564.554
<br />SNOW PLOW MARKER X4-5
<br />EACH
<br />7
<br />$50.00
<br />$350.00
<br />$75.00
<br />$525.00
<br />$60.00
<br />$420.00
<br />$50.00
<br />$350.00
<br />131
<br />2565.511
<br />TRAFFIC CONTROL SIGNAL SYSTEM
<br />SIG SYS
<br />1
<br />$220,000.00
<br />$220,000.00
<br />$204,000.00
<br />$204,000.00
<br />$290,043.00
<br />$290,043.00
<br />$264,150.00
<br />$264,150.00
<br />132
<br />2565.601
<br />EMERGENCY VEHICLE PREEMPTION SYSTEM
<br />LUMP SUM
<br />1
<br />$10,000.00
<br />$10,000.00
<br />$36,000.00
<br />$36,000.00
<br />$5,490.00
<br />$5,490.00
<br />$5,000.00
<br />$5,000.00
<br />133
<br />2573.502
<br />SILT FENCE, TYPE MACHINE SLICED
<br />LIN FT
<br />2615
<br />$2.00
<br />$5,230.00
<br />$1.75
<br />$4,576.25
<br />$2.00
<br />$5,230.00
<br />$1.60
<br />$4,184.00
<br />134
<br />2573.530
<br />STORM DRAIN INLET PROTECTION
<br />EACH
<br />64
<br />$250.00
<br />$16,000.00
<br />$125.00
<br />$8,000.00
<br />$80.00
<br />$5,120.00
<br />$220.00
<br />$14,080.00
<br />135
<br />2573.540
<br />FILTER LOG TYPE WOOD FIBER BIOROLL
<br />LIN FT
<br />654
<br />$4.00
<br />$2,616.00
<br />$2.80
<br />$1,831.20
<br />$3.00
<br />$1,962.00
<br />$3.00
<br />$1,962.00
<br />136
<br />2573.602
<br />CULVERT PROTECTION
<br />EACH
<br />13
<br />$250.00
<br />$3,250.00
<br />$375.00
<br />$4,875.00
<br />$86.00
<br />$1,118.00
<br />$100.00
<br />$1,300.00
<br />137
<br />2575.501
<br />SEEDING
<br />ACRE
<br />15.5
<br />$200.00
<br />$3,100.00
<br />$150.00
<br />$2,325.00
<br />$126.00
<br />$1,953.00
<br />$150.00
<br />$2,325.00
<br />138
<br />2575.502
<br />SEED MIXTURE 240
<br />POUND
<br />900
<br />$1.50
<br />$1,350.00
<br />$3.00
<br />$2,700.00
<br />$2.00
<br />$1,800.00
<br />$3.00
<br />$2,700.00
<br />139
<br />2575.502
<br />SEED MIXTURE 260
<br />POUND
<br />470
<br />$2.00
<br />$940.00
<br />$2.50
<br />$1,175.00
<br />$2.00
<br />$940.00
<br />$2.50
<br />$1,175.00
<br />Page 9
<br />
|