Laserfiche WebLink
Project: 01973-00 - RAMSEY - Armstrong and Bunker Lake Boulevard Int and Extensions <br />Engineers Estimate <br />New Look Contracting, Inc. <br />Kuechle Underground <br />Dresel Contracting, Inc. <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Base Bid <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$110,000.00 <br />$110,000.00 <br />$100,000.00 <br />$100,000.00 <br />$93,000.00 <br />$93,000.00 <br />$200,000.00 <br />p00,000.00 <br />2 <br />2031.501 <br />FIELD OFFICE TYPE D <br />EACH <br />1 <br />$15,000.00 <br />$15,000.00 <br />$9,500.00 <br />$9,500.00 <br />$15,000.00 <br />$15,000.00 <br />$10,000.00 <br />010,000.00 <br />3 <br />2101.501 <br />CLEARING <br />ACRE <br />0.4 <br />$2,200.00 <br />$880.00 <br />$2,500.00 <br />$1,000.00 <br />$1,500.00 <br />$600.00 <br />$2,000.00 <br />$800.00 <br />4 <br />2101.502 <br />CLEARING <br />TREE <br />127 <br />$120.00 <br />$15,240.00 <br />$60.00 <br />$7,620.00 <br />$50.00 <br />$6,350.00 <br />$52.00 <br />$6,604.00 <br />5 <br />2101.506 <br />GRUBBING <br />ACRE <br />0.4 <br />$1,700.00 <br />$680.00 <br />$2,500.00 <br />$1,000.00 <br />$1,100.00 <br />$440.00 <br />$2,000.00 <br />$800.00 <br />6 <br />2101.507 <br />GRUBBING <br />TREE <br />127 <br />$80.00 <br />$10,160.00 <br />$20.00 <br />$2,540.00 <br />$20.00 <br />$2,540.00 <br />$50.00 <br />$6,350.00 <br />7 <br />2104.501 <br />REMOVE METAL CULVERT <br />LIN FT <br />532 <br />$7.00 <br />$3,724.00 <br />$6.50 <br />$3,458.00 <br />$5.00 <br />$2,660.00 <br />$10.00 <br />$5,320.00 <br />8 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />LIN FT <br />148 <br />$12.00 <br />$1,776.00 <br />$8.50 <br />$1,258.00 <br />$9.00 <br />$1,332.00 <br />$12.00 <br />$1,776.00 <br />9 <br />2104.501 <br />REMOVE SEWER PIPE (SANITARY) <br />LIN FT <br />6 <br />$7.00 <br />$42.00 <br />$25.00 <br />$150.00 <br />$25.00 <br />$150.00 <br />$50.00 <br />$300.00 <br />10 <br />2104.501 <br />REMOVE STEEL CASING <br />LIN FT <br />10 <br />$65.00 <br />$650.00 <br />$50.00 <br />$500.00 <br />$74.00 <br />$740.00 <br />$50.00 <br />$500.00 <br />11 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />20800 <br />$2.00 <br />$41,600.00 <br />$2.25 <br />$46,800.00 <br />$2.00 <br />$41,600.00 <br />$1.00 <br />0520,800.00 <br />12 <br />2104.509 <br />REMOVE CONCRETE APRON <br />EACH <br />3 <br />$250.00 <br />$750.00 <br />$150.00 <br />$450.00 <br />$84.00 <br />$252.00 <br />$150.00 <br />$450.00 <br />13 <br />2104.509 <br />REMOVE DRAINAGE STRUCTURE <br />EACH <br />1 <br />$150.00 <br />$150.00 <br />$500.00 <br />$500.00 <br />$280.00 <br />$280.00 <br />$250.00 <br />$250.00 <br />14 <br />2104.509 <br />REMOVE SIGN TYPE C <br />EACH <br />35 <br />$25.00 <br />$875.00 <br />$25.00 <br />$875.00 <br />$25.00 <br />$875.00 <br />$30.00 <br />$1,050.00 <br />15 <br />2104.509 <br />REMOVE SIGN TYPE SPECIAL <br />EACH <br />1 <br />$120.00 <br />$120.00 <br />$25.00 <br />$25.00 <br />$25.00 <br />$25.00 <br />$30.00 <br />$30.00 <br />16 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />970 <br />$2.50 <br />$2,425.00 <br />$1.85 <br />$1,794.50 <br />$2.00 <br />$1,940.00 <br />$4.00 <br />$3,880.00 <br />17 <br />2104.521 <br />SALVAGE FENCE <br />LIN FT <br />400 <br />$8.00 <br />$3,200.00 <br />$7.00 <br />$2,800.00 <br />$7.00 <br />$2,800.00 <br />$7.25 <br />$2,900.00 <br />18 <br />2104.521 <br />SALVAGE METAL CULVERTS <br />LIN FT <br />72 <br />$7.00 <br />$504.00 <br />$10.00 <br />$720.00 <br />$11.00 <br />$792.00 <br />$20.00 <br />$1,440.00 <br />19 <br />2104.523 <br />SALVAGE GATE VALVE <br />EACH <br />1 <br />$150.00 <br />$150.00 <br />$250.00 <br />$250.00 <br />$630.00 <br />$630.00 <br />$650.00 <br />$650.00 <br />20 <br />2104.523 <br />SALVAGE HYDRANT <br />EACH <br />1 <br />$300.00 <br />$300.00 <br />$500.00 <br />$500.00 <br />$630.00 <br />$630.00 <br />$1,250.00 <br />$1,250.00 <br />21 <br />2104.523 <br />SALVAGE METAL APRON <br />EACH <br />2 <br />$250.00 <br />$500.00 <br />$150.00 <br />$300.00 <br />$75.00 <br />$150.00 <br />$200.00 <br />$400.00 <br />22 <br />2104.523 <br />SALVAGE SIGN TYPE SPECIAL <br />EACH <br />2 <br />$180.00 <br />$360.00 <br />$25.00 <br />$50.00 <br />$25.00 <br />$50.00 <br />$30.00 <br />$60.00 <br />23 <br />2105.525 <br />TOPSOIL BORROW (CV) <br />CU YD <br />500 <br />$12.00 <br />$6,000.00 <br />$16.50 <br />$8,250.00 <br />$13.00 <br />$6,500.00 <br />$18.00 <br />$9,000.00 <br />24 <br />2105.601 <br />DEWATERING <br />LUMP SUM <br />1 <br />$20,000.00 <br />$20,000.00 <br />$155,000.00 <br />$155,000.00 <br />$57,000.00 <br />$57,000.00 <br />$82,500.00 <br />$82,500.00 <br />25 <br />2106.607 <br />EXCAVATION - COMMON <br />CU YD <br />34767 <br />$5.00 <br />$173,835.00 <br />$5.75 <br />$199,910.25 <br />$3.76 <br />$130,723.92 <br />$4.00 <br />$139,068.00 <br />26 <br />2106.607 <br />COMMON EMBANKMENT (CV) <br />CU YD <br />36135 <br />$2.00 <br />$72,270.00 <br />$4.50 <br />$162,607.50 <br />$4.91 <br />$177,422.85 <br />$5.00 <br />$180,675.00 <br />27 <br />2106.607 <br />SELECT GRANULAR EMBANKMENT (CV) <br />CU YD <br />300 <br />$8.00 <br />$2,400.00 <br />$14.50 <br />$4,350.00 <br />$11.00 <br />$3,300.00 <br />$12.00 <br />$3,600.00 <br />28 <br />2112.604 <br />SUBGRADE PREPARATION <br />SQ YD <br />44810 <br />$0.75 <br />$33,607.50 <br />$1.10 <br />$49,291.00 <br />$0.75 <br />$33,607.50 <br />$1.00 <br />=$44,810.00 <br />29 <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />40 <br />$130.00 <br />$5,200.00 <br />$115.00 <br />$4,600.00 <br />$115.00 <br />$4,600.00 <br />$100.00 <br />$4,000.00 <br />30 <br />2130.501 <br />WATER <br />M GALLONS <br />100 <br />$20.00 <br />$2,000.00 <br />$35.00 <br />$3,500.00 <br />$50.00 <br />$5,000.00 <br />$35.00 <br />$3,500.00 <br />31 <br />2211.503 <br />AGGREGATE BASE (CV) CLASS 5 MODIFIED <br />CU YD <br />14801 <br />$22.00 <br />$325,622.00 <br />$18.95 <br />$280,478.95 <br />$20.00 <br />$296,020.00 <br />$24.00 <br />$355,224.00 <br />32 <br />2221.503 <br />AGGREGATE SHOULDERING (CV) CLASS 5 MOD <br />CU YD <br />760 <br />$17.00 <br />$12,920.00 <br />$29.50 <br />$22,420.00 <br />$21.00 <br />$15,960.00 <br />$35.00 <br />$26,600.00 <br />33 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (4,C) <br />TON <br />8459 <br />$60.00 <br />$507,540.00 <br />$59.57 <br />$503,902.63 <br />$61.00 <br />$515,999.00 <br />$62.00 <br />$524,458.00 <br />34 <br />2360.502 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,B) <br />TON <br />5691 <br />$55.00 <br />$313,005.00 <br />$55.07 <br />$313,403.37 <br />$58.00 <br />$330,078.00 <br />$56.00 <br />$318,696.00 <br />Page 11 <br />