Laserfiche WebLink
Project: 01973-00 - RAMSEY - Armstrong and Bunker Lake Boulevard Int and Extensions <br />Engineers Estimate <br />Burschville Construction, Inc. <br />Northwest Asphalt, Inc. <br />S. R. Weidema, Inc. <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Base Bid <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$110,000.00 <br />$110,000.00 <br />$113,000.00 <br />$113,000.00 <br />$130,458.00 <br />$130,458.00 <br />$115,000.00 <br />$115,000.00 <br />2 <br />2031.501 <br />FIELD OFFICE TYPE D <br />EACH <br />1 <br />$15,000.00 <br />$15,000.00 <br />$50,000.00 <br />$50,000.00 <br />$12,500.00 <br />$12,500.00 <br />$12,200.00 <br />$12,200.00 <br />3 <br />2101.501 <br />CLEARING <br />ACRE <br />0.4 <br />$2,200.00 <br />$880.00 <br />$1,600.00 <br />$640.00 <br />$1,200.00 <br />$480.00 <br />$1,500.00 <br />$600.00 <br />4 <br />2101.502 <br />CLEARING <br />TREE <br />127 <br />$120.00 <br />$15,240.00 <br />$50.00 <br />$6,350.00 <br />$60.00 <br />$7,620.00 <br />$65.00 <br />$8,255.00 <br />5 <br />2101.506 <br />GRUBBING <br />ACRE <br />0.4 <br />$1,700.00 <br />$680.00 <br />$1,100.00 <br />$440.00 <br />$1,200.00 <br />$480.00 <br />$1,500.00 <br />$600.00 <br />6 <br />2101.507 <br />GRUBBING <br />TREE <br />127 <br />$80.00 <br />$10,160.00 <br />$25.00 <br />$3,175.00 <br />$20.00 <br />$2,540.00 <br />$20.00 <br />$2,540.00 <br />7 <br />2104.501 <br />REMOVE METAL CULVERT <br />LIN FT <br />532 <br />$7.00 <br />$3,724.00 <br />$6.00 <br />$3,192.00 <br />$3.50 <br />$1,862.00 <br />$5.65 <br />$3,005.80 <br />8 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />LIN FT <br />148 <br />$12.00 <br />$1,776.00 <br />$10.00 <br />$1,480.00 <br />$5.00 <br />$740.00 <br />$10.00 <br />$1,480.00 <br />9 <br />2104.501 <br />REMOVE SEWER PIPE (SANITARY) <br />LIN FT <br />6 <br />$7.00 <br />$42.00 <br />$100.00 <br />$600.00 <br />$15.00 <br />$90.00 <br />$117.00 <br />$702.00 <br />10 <br />2104.501 <br />REMOVE STEEL CASING <br />LIN FT <br />10 <br />$65.00 <br />$650.00 <br />$100.00 <br />$1,000.00 <br />$20.00 <br />$200.00 <br />$140.00 <br />$1,400.00 <br />11 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQYD <br />20800 <br />$2.00 <br />$41,600.00 <br />$2.75 <br />$57,200.00 <br />$0.75 <br />$15,600.00 <br />$2.00 <br />$41,600.00 <br />12 <br />2104.509 <br />REMOVE CONCRETE APRON <br />EACH <br />3 <br />$250.00 <br />$750.00 <br />$300.00 <br />$900.00 <br />$250.00 <br />$750.00 <br />$200.00 <br />$600.00 <br />13 <br />2104.509 <br />REMOVE DRAINAGE STRUCTURE <br />EACH <br />1 <br />$150.00 <br />$150.00 <br />$400.00 <br />$400.00 <br />$500.00 <br />$500.00 <br />$250.00 <br />$250.00 <br />14 <br />2104.509 <br />REMOVE SIGN TYPE C <br />EACH <br />35 <br />$25.00 <br />$875.00 <br />$26.00 <br />$910.00 <br />$20.00 <br />$700.00 <br />$25.00 <br />$875.00 <br />15 <br />2104.509 <br />REMOVE SIGN TYPE SPECIAL <br />EACH <br />1 <br />$120.00 <br />$120.00 <br />$30.00 <br />$30.00 <br />$45.00 <br />$45.00 <br />$25.00 <br />$25.00 <br />16 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />970 <br />$2.50 <br />$2,425.00 <br />$3.50 <br />$3,395.00 <br />$3.00 <br />$2,910.00 <br />$3.35 <br />$3,249.50 <br />17 <br />2104.521 <br />SALVAGE FENCE <br />LIN FT <br />400 <br />$8.00 <br />$3,200.00 <br />$8.00 <br />$3,200.00 <br />$10.00 <br />$4,000.00 <br />$7.00 <br />$2,800.00 <br />18 <br />2104.521 <br />SALVAGE METAL CULVERTS <br />LIN FT <br />72 <br />$7.00 <br />$504.00 <br />$20.00 <br />$1,440.00 <br />$4.00 <br />$288.00 <br />$13.00 <br />$936.00 <br />19 <br />2104.523 <br />SALVAGE GATE VALVE <br />EACH <br />1 <br />$150.00 <br />$150.00 <br />$500.00 <br />$500.00 <br />$100.00 <br />$100.00 <br />$177.00 <br />$177.00 <br />20 <br />2104.523 <br />SALVAGE HYDRANT <br />EACH <br />1 <br />$300.00 <br />$300.00 <br />$750.00 <br />$750.00 <br />$200.00 <br />$200.00 <br />$355.00 <br />$355.00 <br />21 <br />2104.523 <br />SALVAGE METAL APRON <br />EACH <br />2 <br />$250.00 <br />$500.00 <br />$100.00 <br />$200.00 <br />$75.00 <br />$150.00 <br />$57.00 <br />$114.00 <br />22 <br />2104.523 <br />SALVAGE SIGN TYPE SPECIAL <br />EACH <br />2 <br />$180.00 <br />$360.00 <br />$30.00 <br />$60.00 <br />$45.00 <br />$90.00 <br />$25.00 <br />$50.00 <br />23 <br />2105.525 <br />TOPSOIL BORROW (CV) <br />CU YD <br />500 <br />$12.00 <br />$6,000.00 <br />$14.00 <br />$7,000.00 <br />$29.00 <br />$14,500.00 <br />$15.60 <br />$7,800.00 <br />24 <br />2105.601 <br />DEWATERING <br />LUMP SUM <br />1 <br />$20,000.00 <br />$20,000.00 <br />$189,000.00 <br />$189,000.00 <br />$135,615.00 <br />$135,615.00 <br />$160,000.00 <br />$160,000.00 <br />25 <br />2106.607 <br />EXCAVATION - COMMON <br />CU YD <br />34767 <br />$5.00 <br />$173,835.00 <br />$6.25 <br />$217,293.75 <br />$6.00 <br />$208,602.00 <br />$4.00 <br />$139,068.00 <br />26 <br />2106.607 <br />COMMON EMBANKMENT (CV) <br />CU YD <br />36135 <br />$2.00 <br />$72,270.00 <br />$4.50 <br />$162,607.50 <br />$13.00 <br />$469,755.00 <br />$7.50 <br />$271,012.50 <br />27 <br />2106.607 <br />SELECT GRANULAR EMBANKMENT (CV) <br />CU YD <br />300 <br />$8.00 <br />$2,400.00 <br />$14.10 <br />$4,230.00 <br />$15.00 <br />$4,500.00 <br />$20.25 <br />$6,075.00 <br />28 <br />2112.604 <br />SUBGRADE PREPARATION <br />SQYD <br />44810 <br />$0.75 <br />$33,607.50 <br />$0.70 <br />$31,367.00 <br />$0.60 <br />$26,886.00 <br />$1.16 <br />$51,979.60 <br />29 <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />40 <br />$130.00 <br />$5,200.00 <br />$100.00 <br />$4,000.00 <br />$135.00 <br />$5,400.00 <br />$125.00 <br />$5,000.00 <br />30 <br />2130.501 <br />WATER <br />M GALLONS <br />100 <br />$20.00 <br />$2,000.00 <br />$27.00 <br />$2,700.00 <br />$50.00 <br />$5,000.00 <br />$33.00 <br />$3,300.00 <br />31 <br />2211.503 <br />AGGREGATE BASE (CV) CLASS 5 MODIFIED <br />CU YD <br />14801 <br />$22.00 <br />$325,622.00 <br />$18.70 <br />$276,778.70 <br />$23.95 <br />$354,483.95 <br />$23.50 <br />$347,823.50 <br />32 <br />2221.503 <br />AGGREGATE SHOULDERING (CV) CLASS 5 MOD <br />CU YD <br />760 <br />$17.00 <br />$12,920.00 <br />$22.00 <br />$16,720.00 <br />$31.20 <br />$23,712.00 <br />$30.00 <br />$22,800.00 <br />33 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (4,C) <br />TON <br />8459 <br />$60.00 <br />$507,540.00 <br />$61.80 <br />$522,766.20 <br />$61.40 <br />$519,382.60 <br />$59.60 <br />$504,156.40 <br />34 <br />2360.502 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,B) <br />TON <br />5691 <br />$55.00 <br />$313,005.00 <br />$55.00 <br />$313,005.00 <br />$60.40 <br />$343,736.40 <br />$58.35 <br />$332,069.85 <br />Page 16 <br />