My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/31/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 05/31/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:05:57 PM
Creation date
5/26/2011 6:43:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/31/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 05/31/2011 <br />By: Tim Himmer, Engineering/Public <br />Works <br />Title: <br />Consider Change Order for City Project #10-24; Wetland 656 Outlet <br />7. 7. <br />Background: <br />In an effort to provide flood protection and to improve overall drainage through the watershed, the City identified a <br />ditch cleaning project known as the 656W Wetland Outlet Project. This project (as illustrated on the enclosed aerial <br />photograph) would create an outlet for wetland 656W, the large wetland complex south of Alpine Drive and east of <br />Ramsey Blvd., by cleaning out approximately 3000 feet of drainage ditch and/or culverts. The project was <br />approved approved by Council and a contract awarded on February 8, 2011. <br />Observations: <br />The project was substantially completed in the month of February, with only some culvert cleaning and turf <br />restoration to be conducted in the spring when things thawed out. When the culvert at the intersection of 156th <br />Avenue and Hematite Street was jetted out this spring it was observed that the side walls were failing and tree root <br />intrusion was causing the deterioration of the entire culvert, therefore it will need to be replaced. There were no <br />accommodations in the contract for culvert replacement, so Council must consider a change order for this work (see <br />attached). It should be noted that there is a second culvert that must be replaced, located on 157th Lane, but since <br />that roadway will be receiving an overlay with the 2011 Street Maintenance Program (SMP) we will be including <br />that replacement under that project. <br />Recommendation: <br />Staff recommends approval of the change order with Dryden Excavating in the amount of $8,500. <br />Funding Source: <br />Funding for this project to date (original contract amount of $28,026) has come from the City's Stormwater Utility <br />Fund, and this change order is proposed to be funded from that account as well. <br />Council Action: <br />Motion to approve <br />Location Map <br />Change Order Proposal <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 05/26/2011 01:35 PM <br />Kurt Ulrich Kurt Ulrich 05/26/2011 02:52 PM <br />Form Started By: Tim Himmer Started On: 05/24/2011 04:06 PM <br />Final Approval Date: 05/26/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.