Laserfiche WebLink
CC Regular Session <br />Meeting Date: 05/31/2011 <br />By: Tim Himmer, Engineering/Public <br />Works <br />Title: <br />Consider Change Order for City Project #10-24; Wetland 656 Outlet <br />7. 7. <br />Background: <br />In an effort to provide flood protection and to improve overall drainage through the watershed, the City identified a <br />ditch cleaning project known as the 656W Wetland Outlet Project. This project (as illustrated on the enclosed aerial <br />photograph) would create an outlet for wetland 656W, the large wetland complex south of Alpine Drive and east of <br />Ramsey Blvd., by cleaning out approximately 3000 feet of drainage ditch and/or culverts. The project was <br />approved approved by Council and a contract awarded on February 8, 2011. <br />Observations: <br />The project was substantially completed in the month of February, with only some culvert cleaning and turf <br />restoration to be conducted in the spring when things thawed out. When the culvert at the intersection of 156th <br />Avenue and Hematite Street was jetted out this spring it was observed that the side walls were failing and tree root <br />intrusion was causing the deterioration of the entire culvert, therefore it will need to be replaced. There were no <br />accommodations in the contract for culvert replacement, so Council must consider a change order for this work (see <br />attached). It should be noted that there is a second culvert that must be replaced, located on 157th Lane, but since <br />that roadway will be receiving an overlay with the 2011 Street Maintenance Program (SMP) we will be including <br />that replacement under that project. <br />Recommendation: <br />Staff recommends approval of the change order with Dryden Excavating in the amount of $8,500. <br />Funding Source: <br />Funding for this project to date (original contract amount of $28,026) has come from the City's Stormwater Utility <br />Fund, and this change order is proposed to be funded from that account as well. <br />Council Action: <br />Motion to approve <br />Location Map <br />Change Order Proposal <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 05/26/2011 01:35 PM <br />Kurt Ulrich Kurt Ulrich 05/26/2011 02:52 PM <br />Form Started By: Tim Himmer Started On: 05/24/2011 04:06 PM <br />Final Approval Date: 05/26/2011 <br />